Improvement To Approach Road Hadgaon Bk. To Gopegaon Road From Sh 61 And Construction Of Cd Work Ch1/500 To 2/500. (Vr 10). Tq. Pathri And Dist. Parbhani.
|
Description |
Improvement To Approach Road Hadgaon Bk. To Gopegaon Road From Sh 61 And Construction Of Cd Work Ch1/500 To 2/500. (Vr 10). Tq. Pathri And Dist. Parbhani.
|
Organisation | RDD-CEO-PARBHANI | State Govt. and UT |
Tender Id | 2024_PARBH_1131094_1 |
Reference Number |
ZPPBN/WD/eTENDER/620/24-25 |
Tender Fee | 5700 |
EMD | 20702 |
Tender Value | |
Place | Tq. Pathri and Dist. Parbhani. |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1971853 |
Start Date | December 30, 2024 18:30 |
End Date |
13/01/2025 ( Expired 150 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreConstruction of cc road and drain from kk shrivastav factory to trinching groun at ward no 10 and 12 tikamgarh
Construction of cc road and drain from kk shrivastav factory to trinching groun at ward no 10 and 12 tikamgarh
Read moreSurface improvement and road safety work under crif from km 75.50 to 143.40 of state highway no. 32 of late shri geetaram pokhriyal motor road (marchula- saraikhet- baijro- pokhda- satpuli- pauri motor road).
Surface improvement and road safety work under crif from km 75.50 to 143.40 of state highway no. 32 of late shri geetaram pokhriyal motor road (marchula- saraikhet- baijro- pokhda- satpuli- pauri motor road).
Read moreZone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreProtection work of approach road to dam and providing and laying interlocking tiles from dam control room to adit-i portal of sewa-ii power station.
Protection work of approach road to dam and providing and laying interlocking tiles from dam control room to adit-i portal of sewa-ii power station.
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreConstruction work of cc road and covered drain from purustam mishra house in ward no. 08 through the shiva temple to the interlocking road.
Construction work of cc road and covered drain from purustam mishra house in ward no. 08 through the shiva temple to the interlocking road.
Read moreConstruction work of c.c. road and covered drain from jaynath pandey house to gulab house in ward no. 14.