Tender Details

Particulars Details
Title
Remaining Work Of Widening And Strengthening Of Pratapgarh Luhariya Nakor Barawarda Dholapani Dhawta Chhotisadri Road (Mdr 260) Km. 0/0 To 12/400 And 19/200 To 27/0
Description
Remaining Work Of Widening And Strengthening Of Pratapgarh Luhariya Nakor Barawarda Dholapani Dhawta Chhotisadri Road (Mdr 260) Km. 0/0 To 12/400 And 19/200 To 27/0
Organisation PWD - CE AND AS | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 12500
EMD 26.25 Lakh
Tender Value
Place Pratapgarh
Link

AAAAAAAAAA

Login to view
Start Date May 29, 2025 16:30
End Date

17/06/2025 ( 17 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Read more
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge

Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge

Read more
Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.

Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.

Read more
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr

Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr

Read more
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Read more
Rejuvenation and widening (bituminous work), paver block work, r.c.c. drain cover and plantation of c.c. road form main road to bad chowk to sanjay trivedi house, pipla narayanwar

Rejuvenation and widening (bituminous work), paver block work, r.c.c. drain cover and plantation of c.c. road form main road to bad chowk to sanjay trivedi house, pipla narayanwar

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Ward no 19 const of cc road and rcc drain work railway bypass to ravindra sakwar and jayshree mobile home

Ward no 19 const of cc road and rcc drain work railway bypass to ravindra sakwar and jayshree mobile home

Read more
Under the state plan, strengthening and damrikaran work from km 1 to 4 of kandiyalgaon motor road from km 7 of purola gundiyatgaon development block of purola assembly constituency of district uttarkashi. (including maintenance of 3 year)

Under the state plan, strengthening and damrikaran work from km 1 to 4 of kandiyalgaon motor road from km 7 of purola gundiyatgaon development block of purola assembly constituency of district uttarkashi. (including maintenance of 3 year)

Read more
S and s of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 680 zero considered at lapcha on pt 4840 high ground bargiok lapcha rd under 108 rcc 759 brtf sector of project dpk in hp

S and s of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 680 zero considered at lapcha on pt 4840 high ground bargiok lapcha rd under 108 rcc 759 brtf sector of project dpk in hp

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise