Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Koyikkal Devaswom In Ulloor Group Converting The Portion Of The Existing Building Into Dialysis Centre
|
| Description |
Koyikkal Devaswom In Ulloor Group Converting The Portion Of The Existing Building Into Dialysis Centre
|
| Organisation | Travancore Devaswom Board | State Govt. and UT |
| Tender Id | 2024_TDB_659581_1 |
|
Reference Number |
EDT/eT- 56/2023 - 24 |
| Tender Fee | 2950 |
| EMD | 38790 |
| Tender Value | - |
| Place | Koyikkal Devaswom in Ulloor |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1042528 |
| Start Date | March 16, 2024 17:30 |
| End Date |
Expired
25/03/2024
Expired 937 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Pandalam devaswom in aranmula group -shifting aravana preparing machines into old annadhanamandapam and converting hall portion of old annadhanamandapam into aravana preparation room
Pandalam devaswom in aranmula group -shifting aravana preparing machines into old annadhanamandapamand converting hall portion of old annadhanamandapam into aravana preparation room
Read moreCivil and mep works for setting up physiotherapeutic centre for hindlabs at ulloor, thiruvananthapuram
Civil and mep works for setting up physiotherapeutic centre for hindlabs at ulloor, thiruvananthapuram
Read moreRepairing and surfacing of existing bituminous portion and upgradation of existing concrete portion from ananda more
Repairing and surfacing of existing bituminous portion and upgradation of existing concrete portion from ananda more to amloki gram via subhas incline road, andal, paschim bardhaman
Read moreRepairing and surfacing of existing bituminous portion and upgradation of existing concrete portion from purulia to dhanbad via gunja
Repairing and surfacing of existing bituminous portion and upgradation of existing concrete portion from purulia to dhanbad via gunja starting from suvendu mahato cement centre to jharkhand road, purulia-i, purulia (total length - 1.10 km)
Read moreSupply installation, testing and commissioning of radiator to the existing 500kva dg cummins make , model number - ktaa-19-g10 installed at devaswom power house, guruvayur devaswom
Supply installation, testing and commissioning of radiator to the existing 500kva dg cummins make , model number - ktaa-19-g10 installed at devaswom power house, guruvayur devaswom
Read moreErumeli devaswom - mundakkayam group - putting up pandal for north side portion of temple thirumuttom in connection with m and m festival in 1202me
Erumeli devaswom - mundakkayam group - putting up pandal for north side portion of temple thirumuttom in connection with m and m festival in 1202me
Read moreHyb division: replacement of codal life completed ac plants in dialysis centre, rail kalarangg, rail nilayam auditorium.
Hyb division: replacement of codal life completed ac plants in dialysis centre, rail kalarangg, rail nilayam auditorium.
Read moreof your Industry type