Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
E.I Repair Works In Markfed Ncdc And Ardc Godown Complex At Batala Gurdaspur.
|
Description |
E.I Repair Works In Markfed Ncdc And Ardc Godown Complex At Batala Gurdaspur.
|
Organisation | Department of Cooperation | State Govt. and UT |
Tender Id | 2025_Coop_133365_1 |
Reference Number |
No.EE(E)/FED/25/58 dated 25/01/2025 |
Tender Fee | 1317 |
EMD | 12316 |
Tender Value | |
Place | Batala |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=270565 |
Start Date | January 23, 2025 19:00 |
End Date |
29/01/2025 ( Expired 156 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Fleet base buildings landside works (fbl)
Fleet base buildings landside works
 (fbl) - construction of fleet base
 buildings and infrastructure,
 equipment supply, installation,
 commissioning, operation and
 maintenance of landside facilities
 at naval base, karwar, karnataka
Read moreDockyard works (dy)
Dockyard works - construction of
 dockyard buildings and
 infrastructure, equipment supply,
 installation, commissioning,
 operation and maintenance of
 facilities at naval base, karwar,
 karnataka
Read moreFleet base buildings waterfront works (fbw)
Fleet base buildings
 waterfront works(fbw) -
 construction of fleet base
 buildings and infrastructure,
 equipment supply,
 installation, commissioning,
 operation and maintenance of
 waterfront facilities at naval
 base, karwar, karnataka
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreBalance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Read moreDetailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Read moreCertain repair to boundary wall, rcc jallies, fencing and misc repair under age b/r-ii at nams
Certain repair to boundary wall, rcc jallies, fencing and 
 misc repair under age b/r-ii at nams
Read moreStmc hill cutting across the river at ch 126.100 to ch 126.200 in dimapur kohima road section on nh-29
Short term maintenance contract for hill cutting across the river at ch 126.100 to ch 126.200 in dimapur kohima road section on nh-29 in the state of nagaland in fy 2025-26 percentage rate and work order basis
Read moreCs of 2l vup at mukundpur junc 4l vup at lahra mod junc 4l vup at eglas chauraha junc 4l vup at kota kapura junc 4lane vup at poiya junc and 4l of malupur tiraha as part of rectification of morth identified bs in up on epc mode
Cs of 2l vup at mukundpur junc 4l vup at lahra mod junc 4l vup at eglas chauraha junc 4l vup at kota kapura junc 4lane vup at poiya junc and 4l of malupur tiraha as part of rectification of morth identified bs in up on epc mode
Read moreof your Industry type