Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Hiring Of 150 Mm Crawler Mounted Dth Drill Machine For Drilling In Ob And Coal
|
| Description |
Hiring Of 150mm Crawler Mounted Dth Drill Machine For Drilling In Ob And Coal At Srpoc Ii Expansion Project With 16 Hours Availability For A Period Of One Year As Per The Scope Of Work, Terms And Conditions Of Nit Reg.
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 690643 |
|
Reference Number |
ESR25O0102 |
| Tender Fee | 4956 |
| EMD | 1.4 Lakh |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | April 04, 2026 22:30 |
| End Date |
Expired
24/04/2026
Expired 174 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Advanced drilling unit - 5 dia - mk1a-24268,advanced drilling unit - 6 dia - mk1a-24268,advanced drilling unit - drill 5 dia -mk1a-24268,advanced drilling unit - drill 6 dia -mk1a-24268,advanced drilling unit for boring - mk1a-24268
Advanced drilling unit - 5 dia - mk1a-24268,advanced drilling unit - 6 dia - mk1a-24268,advanced drilling unit - drill 5 dia -mk1a-24268,advanced drilling unit - drill 6 dia -mk1a-24268,advanced drilling unit for boring - mk1a-24268
Read moreConstruction of 200 mm dia production well at by dth/odex method of drilling at wullarhama (wullarhama, dachnipora in district anantnag).
Construction of 200 mm dia production well at by dth/odex method of drilling at wullarhama (wullarhama, dachnipora in district anantnag).
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreHiring of 150 mt tyre mounted telescopic crane with operator for echp pipe conveyor works, ntpc, nkstpp (post facto).
Hiring of 150 mt tyre mounted telescopic crane with operator for echp pipe conveyor works, ntpc, nkstpp (post facto).
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreFabrication of bruchid trap,foldable net structure,vertical drilling machine,temperature regulated anaerobic reactor,drawing device-camera lucida,tractor front mounted loader small
Fabrication of bruchid trap,foldable net structure,vertical drilling machine,temperature regulated anaerobic reactor,drawing device-camera lucida,tractor front mounted loader small
Read moreHiring of earth moving equipments, material handling equipments and cranes (per hour basis) - as per buyers requirement heavy duty hard rock drill machine tractor with drilling equipment
Hiring of earth moving equipments, material handling equipments and cranes (per hour basis) - as per buyers requirement heavy duty hard rock drill machine tractor with drilling equipment
Read moreHandling ,transport and other mining services - percentage quote based - handling service, handling & transport service, ob removal, coal extraction, hiring of equipment for removal of obr and extraction of coal by drilling, blasting and dumping at s..
Handling ,transport and other mining services - percentage quote based - handling service, handling & transport service, ob removal, coal extraction, hiring of equipment for removal of obr and extraction of coal by drilling, blasting and dumping at s..
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreGuard soldering iron (n0565-4218154),fan table 16 (n0565-1278297),cordless drilling machine (n4110-p061836),drilling machine 3/8 (n0565-4119169),drilling machine 3/4 220/250v (n0565-4119174),refrigerator 230 ltrs (n4110-000201),deep freezer cap 400 ltrs (n4110-p061814),water cooler capacity 150 ltrs (n4110-p061877),fan circulating desk 230 v ac 18 blade sweep 200 mm (n4140-000070),vacuum cleaner (n4140-p060018),drilling machine (n0565-4119167),wall clock 9 (n0552-0000723)
Guard soldering iron (n0565-4218154),fan table 16 (n0565-1278297),cordless drilling machine (n4110-p061836),drilling machine 3/8 (n0565-4119169),drilling machine 3/4 220/250v (n0565-4119174),refrigerator 230 ltrs (n4110-000201),deep freezer cap 400 ltrs (n4110-p061814),water cooler capacity 150 ltrs (n4110-p061877),fan circulating desk 230 v ac 18 blade sweep 200 mm (n4140-000070),vacuum cleaner (n4140-p060018),drilling machine (n0565-4119167),wall clock 9 (n0552-0000723)
Read moreof your Industry type