Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Cement Concrete Road From Swagat Gate To Datta Mandir At Dongargaon Rly, Taluka Warora, Dist Chandrapur (Mining Royalty)
|
Description |
Construction Of Cement Concrete Road From Swagat Gate To Datta Mandir At Dongargaon Rly, Taluka Warora, Dist Chandrapur (Mining Royalty)
|
Organisation | Public Works Region | State Govt. and UT |
Tender Id | 2024_PWR_1016808_1 |
Reference Number |
NAG/CHN/DN1/SOC/63-7/2023-24 |
Tender Fee | 590 |
EMD | 0 |
Tender Value | |
Place | Chandrapur District |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1778782 |
Start Date | February 26, 2024 14:30 |
End Date |
04/03/2024 ( Expired 468 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of construction of road from bile migging section of frontier highway nh 913 km 0.00 from migging end to 17.812 17.812 km km 17.812 to 55.377 migging end 37.565 km km 0.000 at bile end to
Consultancy services for authoritys engineer for supervision of construction of road from bile migging section of frontier highway nh 913 km 0.00 from migging end to 17.812 17.812 km km 17.812 to 55.377 migging end 37.565 km km 0.000 at bile end to
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction of c.c. road from sudha kurmi to nema ji house and from gupta aunty to shishu mandir school in ward number 10.
Construction of c.c. road from sudha kurmi to nema ji house and from gupta aunty to shishu mandir school in ward number 10.
Read moreConstruction of cc road from cm pdi camp to santosh bansal house via tanka thafai madarsa at ward no 10
Construction of cc road from cm pdi camp to santosh bansal house via tanka thafai madarsa at ward no 10
Read moreConstruction of rcc drain and culvert from moti pals house via betai shukla maharajs house to the main road in front of renu singhs house at ward no 6
Construction of rcc drain and culvert from moti pals house via betai shukla maharajs house to the main road in front of renu singhs house at ward no 6
Read moreConstruction of bt road from dharmottam shukla to mangal bhawan via jakida tiraha at ward no 1
Construction of bt road from dharmottam shukla to mangal bhawan via jakida tiraha at ward no 1
Read moreConstruction of cc road at ward no 05 backside of kali mandir to vishram baiga house.
Construction of cc road at ward no 05 backside of kali mandir to vishram baiga house.
Read moreConstruction of bituminous road from railway crossing (penth bazaar) to mosque at harduaganj thermal power station, aligarh, uttar pradesh
Construction of bituminous road from railway crossing (penth bazaar) to mosque at harduaganj thermal power station, aligarh, uttar pradesh
Read moreof your Industry type