Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 60.00 Metre Span Prestressed Double Lane Bridge Over Shalu Khad On Newati Bavi Road At Newati
|
| Description |
Sh C/O Sub Structure,Super Structure,Widening Of Road On Both Sides Of Approaches And Construction Of Wing Walls And Breast Walls In Approaches On Both Side Of Bridge
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2024_PWD_86363_1 |
|
Reference Number |
20703-710 dated16022024 |
| Tender Fee | 5000 |
| EMD | 8.7 Lakh |
| Tender Value | - |
| Place | Chopal Division |
| Link |
View Original Tender Notice
https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=128443 |
| Start Date | February 17, 2024 23:15 |
| End Date |
Expired
27/02/2024
Expired 961 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 100 mtr span double lane motarable bridge along with approach road over mandi river at chakrara block sathra district poonch
Construction of 100 mtr span double lane motarable bridge along with approach road over mandi river at chakrara block sathra district poonch
Read moreConstruction of 150 mtr span single lane motorable bridge over mandi nallah at kehnu timbra,block sathra.
Construction of 150 mtr span single lane motorable bridge over mandi nallah at kehnu timbra,block sathra.
Read moreConstruction of 15m span double lane motorable bridge on buffliaz to murrah hill kaka road at km 1st rd 300 construction of 15m span double lane motorable bridge on buffliaz to murrah hill kaka road at km 3rd rd 350
Construction of 15m span double lane motorable bridge on buffliaz to murrah hill kaka road at km 1st rd 300 construction of 15m span double lane motorable bridge on buffliaz to murrah hill kaka road at km 3rd rd 350
Read moreConstruction of 50 mtr span single lane steel truss motorable bridge over hill nallah at approach road khadapa middle marhote
Construction of 50 mtr span single lane steel truss motorable bridge over hill nallah at approach road khadapa middle marhote
Read moreConstruction of 30 meter span (1.5 lane) p.s.c. girder bridge over bangla nala in ward no. 3 of gram sabha bhattowala, rishikesh constituency, dehradun district under the state sector.
Construction of 30 meter span (1.5 lane) p.s.c. girder bridge over bangla nala in ward no. 3 of gram sabha bhattowala, rishikesh constituency, dehradun district under the state sector.
Read moreConstruction of balance work of 165.00 mtr span double lane bridge on nahan dadahu haripurdhar road at rd 35/690.(sh c/o of approach road along with m/t) under crf (job no. crf-hp-2018-19-155)
Construction of balance work of 165.00 mtr span double lane bridge on nahan dadahu haripurdhar road at rd 35/690.(sh c/o of approach road along with m/t) under crf (job no. crf-hp-2018-19-155)
Read moreC/o 60.00 mtr span pre-stressed double land bridge over shallu khad on neoty chhawani bavi road at neoty
Preparation of hydraulic data, gad (general arrangement of drawings), structural design of foundation, sub structure an super structure and proof checking of detailed design and structure drawings of 60.00 mtr. span double lane steel truss bridge and
Read moreC/o 60m span double lane bridge over shallu khad on neoty chawani bavi road at neoty
C/o 60 mtrs span double lane steel truss bridge over shallu khad (under ridf-xxxi
Read moreC/o 60.00 mtr span pre-stressed double lane bridge over shallu khud on neoty chhawani bawi road at neoty
Widening of road in earth work at r.d. 68/885 to 69/067.50
Read moreC/o 250.00 mtrs span double lane prestressed concrete motorable with footpath(2 no. span of 40.00 metre each) over bias river at sadhora pattan connecting village dobber kalan (hamirpur district) to village silh (kangra district
Construction of bridge of 250.00 metre span of double lane with standard with footpath at km 0/625 including construction of approaches on both side in km 0/00 to 0/500 (hamirpur side) and in km 0/750 to 1/00 (kangra side) complete in all respects
Read moreof your Industry type