Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Remodelling Of Water Supply Scheme To Dhar Lammer In Gp Tindi Distt L S Hp
|
Description |
Sh Co P S P 4 Nos C O Barbed Wire Fencing Around S Tank And Locking Arrangement C O Storage Tank 25000 Ltrs Capacity C O Protection Wall With Wire Crate 50 Mtrs And Providing Laying Jointing And Testing Of Hdpe Pipe Various Dia
|
Organisation | HP Irrigation and Public Health | State Govt. and UT |
Tender Id | 2024_HPIPH_91366_1 |
Reference Number |
2258-2307 dated 02.08.2024 |
Tender Fee | 400 |
EMD | 57008 |
Tender Value | |
Place | Udaipur |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=135008 |
Start Date | August 03, 2024 15:30 |
End Date |
13/08/2024 ( Expired 327 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii blocks of purba medinipur- wbdwsip/dww/em/03/2025-26
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii block of purba medinipur district with 2 yrs. o and m wbdwsip/dww/em/03/2025-26
Read moreConsultancy services for preparation of dpr for 4 l of rudrampur to bhadrachalam section from km 71.0 to 171.6 of vijayawada to jagadalpur section of nh 30 and construction of kothagudem bypass connecting nh 930p and nh 30 in the state of telangana
Consultancy services for preparation of dpr for 4 l of rudrampur to bhadrachalam section from km 71.0 to 171.6 of vijayawada to jagadalpur section of nh 30 and construction of kothagudem bypass connecting nh 930p and nh 30 in the state of telangana
Read moreImprovement of existing water supply at mic and s under ge south ahmednagar
Improvement of existing water supply at mic and s
 under ge south ahmednagar 
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreS/r of bhadson tarkheri road (odr-52) l-9.52 km distt. patiala under head-5054 rb-10 fy 2025-26 with 5 year routine maintenance after completion of work (2nd year to 5th year) (1st year will be considered as defect lability period)
S/r of bhadson tarkheri road (odr-52) l-9.52 km distt. patiala under head-5054 rb-10 fy 2025-26 with 5 year routine maintenance after completion of work (2nd year to 5th year) (1st year will be considered as defect lability period)
Read moreFor modernization of of link road sabgrur road mehmadpur to nabha via barsat souja rahit basta in mc patiala with 5 year maintenance mc patiala under special assistance tostate for capital investment 202526 600 crore project distt patiala group no.
For modernization of of link road sabgrur road mehmadpur to nabha via barsat souja rahit basta in mc patiala with 5 year maintenance mc patiala under special assistance tostate for capital investment 202526 600 crore project distt patiala group no.
Read moreLean to shed covered area for various places and extension of covered roof storage area in rdq yard with rcc flooring and side coverage of open area to avoid rain water entry during rain bangalore complex, beml limited.
Lean to shed covered area for various places and extension of covered roof storage area in rdq yard with rcc flooring and side coverage of open area to avoid rain water entry during rain bangalore complex, beml limited.
Read moreCs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Cs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Read moreWork of augmentation of water supply system of nagar parishad sarai distt. singrauli town under amrut 2.0 (m.p.)
Work of augmentation of water supply system of nagar parishad sarai distt. singrauli town under amrut 2.0 (m.p.)
Read moreSplrepair to taxi track between bldg no p-21 22 r o flt hangar p48, kote of 671 army avn sqn r o and spl repair to epoxy coating and water supply pipe line of bldg no t06a t5a utility hanars of 204 army avn sqn at dinjan under ge dinjan
Splrepair to taxi track between bldg no p-21 22 r o flt hangar p48, kote of 671 army avn sqn r o and spl repair to epoxy coating and water supply pipe line of bldg no t06a t5a utility hanars of 204 army avn sqn at dinjan under ge dinjan
Read moreof your Industry type