Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Work Contract For Dismantling, Shifting And Re Floating, Erection And Commissioning Of Floating Barge With Equipments At Ash Dyke Phase I, To Suitable Location On The Water Pool In Ash Dyke Phase Ii At Sgtps, Mppgcl, Birsinghpur
|
| Description |
Work Contract For Dismantling, Shifting And Re Floating, Erection And Commissioning Of Floating Barge With Equipments At Ash Dyke Phase I, To Suitable Location On The Water Pool In Ash Dyke Phase Ii At Sgtps, Mppgcl, Birsinghpur
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_MPPGC_282773_1 |
|
Reference Number |
282773 |
| Tender Fee | 1000 |
| EMD | 40200 |
| Tender Value | |
| Place | Office of SE(PNW) SGTPS |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | June 29, 2023 19:30 |
| End Date |
Expired
18/08/2023
Expired 1052 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tender for renovation and up-gradation of road along ash pipe line corridor of ash dyke i and ii phase-1 at sgtps birsinghpur
Tender for renovation and up-gradation of road along ash pipe line corridor of ash dyke i and ii phase-1 at sgtps birsinghpur
Read moreAnnual maintenance of ash dyke phase i and ii and ash pond management for pollution control works and operation and maintenance of weir / shaft phase-i and ii at sgtps, birsinghpur
Annual maintenance of ash dyke phase i and ii and ash pond management for pollution control works and operation and maintenance of weir / shaft phase-i and ii at sgtps, birsinghpur
Read moreProtection audit of electrical equipments of 4x210mw ph i ii at sgtps mppgcl birsinghpur.
Protection audit of electrical equipments of 4x210mw ph i ii at sgtps mppgcl birsinghpur.
Read moreSupply dismantling erection and commissioning of apron feeder bottom hopper chute installed at wagon tippler at sgtps mppgcl birsinghpur
Supply dismantling erection and commissioning of apron feeder bottom hopper chute installed at wagon tippler at sgtps mppgcl birsinghpur
Read moreWork contract for consultancy service for complete design and engineering of civil, mechanical, c and i and electrical work for the modification of management of ash at ash dyke ii at sgtps, mppgcl, birsinghpur
Work contract for consultancy service for complete design and engineering of civil, mechanical, c and i and electrical work for the modification of management of ash at ash dyke ii at sgtps, mppgcl, birsinghpur
Read moreTransportation of ash from temporary storage besides barge unit i and ii in ash dump area phase i of sgtps, mppgcl, birsinghpur, distt. umaria (m.p.) to kunwari mines for filling including excavation, loading/ lifting, unloading, spreading and compac
Transportation of ash from temporary storage besides barge unit i and ii in ash dump area phase i of sgtps, mppgcl, birsinghpur, distt. umaria (m.p.) to kunwari mines for filling including excavation, loading/ lifting, unloading, spreading and compac
Read moreWork contract for dismantling of existing buck stay of water wall panel and its erection, commissioning in abl make 210 mw boiler unit no.1 of ph-i, sgtps, mppgcl, birsinghpur
Work contract for dismantling of existing buck stay of water wall panel and its erection, commissioning in abl make 210 mw boiler unit no.1 of ph-i, sgtps, mppgcl, birsinghpur
Read moreWork contract for laying of 400 nb recovery water pipeline (3000 mtrs. approx) from shaft at new ash dyke to target box near ph-ii and ph-iii, at sgtps, mppgcl, birsinghpur
Work contract for laying of 400 nb recovery water pipeline (3000 mtrs. approx) from shaft at new ash dyke to target box near ph-ii and ph-iii, at sgtps, mppgcl, birsinghpur
Read moreWork contract for installation and commissioning of old ash slurry pumps in seepage water pump house as ash dyke of phase-i,sstpp,mppgcl,dongalia.
Work contract for installation and commissioning of old ash slurry pumps in seepage water pump house as ash dyke of phase-i,sstpp,mppgcl,dongalia.
Read moreTransportation of ash from temporary storage besides barge unit 1an ii in ash dump area phase-i of sgtps, mppgcl, birsinghpur to kunwari mines for filling including excavation, loading or lifting, unloading, spreading and compaction works.
Transportation of ash from temporary storage besides barge unit 1an ii in ash dump area phase-i of sgtps, mppgcl, birsinghpur to kunwari mines for filling including excavation, loading or lifting, unloading, spreading and compaction works.
Read moreof your Industry type