Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Installation Of Submersible Pump Over Headed Water Tank With Solar System Near Fultola At Mulgram Sandad .
|
Description |
Construction Installation Of Submersible Pump Over Headed Water Tank With Solar System Near Fultola At Mulgram Sandad .
|
Organisation | Zilla Parishad | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2500 |
EMD | 4000 |
Tender Value | |
Place | FULTOLA,MULGRAM |
Link |
AAAAAAAAAA Login to view |
Start Date | June 16, 2025 14:30 |
End Date |
23/06/2025 ( 0 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstruction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Read moreRejuvenation of sankat mochan lake with construction, installation and commissioning of 100 kld stp under amrut 2.0 scheme at chhatarpur
Rejuvenation of sankat mochan lake with construction, installation and commissioning of 100 kld stp under amrut 2.0 scheme at chhatarpur
Read moreSupply, installation, testing and commissioning of electrical, hvac, announcement system, elv system and other associate works on sub contract basis in connection with re-development of ernakulam junction railway station at ernakulam, kerala
Supply, installation, testing and commissioning of electrical, hvac, announcement system, elv system and other associate works on sub contract basis in connection with re-development of ernakulam junction railway station at ernakulam, kerala
Read moreLong-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Long-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Read moreConstruction of foot over bridge with ramps at km 70800 near jagahedi village of nh709ad in the stretch from shamli to muzaffarnagar pkgii in the state of uttar pradesh
Construction of foot over bridge with ramps at km 70800 near jagahedi village of nh709ad in the stretch from shamli to muzaffarnagar pkgii in the state of uttar pradesh
Read moreConstruction of proposed 18 tpd municipal wet and dry waste processing plant, leachate tank with rain water harvesting unit...other ancillary works for proposed 18 tpd municipal waste processing plant under swm project within baruipur municipality.
Construction of proposed 18 tpd municipal wet and dry waste processing plant, leachate tank with rain water harvesting unit...other ancillary works for proposed 18 tpd municipal waste processing plant under swm project within baruipur municipality.
Read moreConstruction of rain water harvesting system at 400/220 kv rajarhat gis ss
Construction of rain water harvesting system at 400/220 kv rajarhat gis ss
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreDesign, fabrication, supply, installation, testing and commissioning of total 1095 kw grid connected solar pv power plant with roof-top net metering at 32 police station in gadchiroli, and 7 police station in bhandara
Design, fabrication, supply, installation, testing and commissioning of total 1095 kw grid connected solar pv power plant with roof-top net metering at 32 police station in gadchiroli, and 7 police station in bhandara
Read moreof your Industry type