Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mechanized Excavation Loading Transportation And Unloading Of 5 Lakhs Tons Of Iron Ore Fines From Dep10 And11 A Fine Ore Stockpile Lp And Tech Pro Siding Lp To Fine Ore Dump Fod Through Nmdc Weigh Bridges
|
| Description |
Mechanized Excavation Loading Transportation And Unloading Of 5 Lakhs Tons Of Iron Ore Fines From Dep10 And11 A Fine Ore Stockpile Lp And Tech Pro Siding Lp To Fine Ore Dump Fod Through Nmdc Weigh Bridges
|
| Organisation | NMDC Limited | Central Govt. Ministry/Department |
| Tender Id | 2025_NMDC_813367_1 |
|
Reference Number |
G-37 |
| Tender Fee | 0 |
| EMD | 2.3 Lakh |
| Tender Value | |
| Place | Bacheli |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1118212 |
| Start Date | September 22, 2025 17:25 |
| End Date |
Expired
06/10/2025
Expired 242 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mechanized excavation, loading, transportation and unloading of 5.00 (five) lakh tons of iron ore fines from dep. 10/11a fine ore stock pile to fine ore dump fod through nmdc weigh bridges in loading plant area
Mechanized excavation, loading, transportation and unloading of 5.00 (five) lakh tons of iron ore fines from dep. 10/11a fine ore stock pile to fine ore dump (fod) through nmdc weigh bridges in loading plant area at an average lead distance of 1.80-
Read moreTransportation of 16,000 tons of iron ore fines from diom loading plant to fines or slime stockpile at beneficiation plant donimalai, sandur taluk, district bellary, karnataka 583118
Transportation of 16,000 tons of iron ore fines from diom loading plant to fines or slime stockpile at beneficiation plant donimalai, sandur taluk, district bellary, karnataka 583118
Read moreMechanized excavation, loading, transportation and unloading at new siding route no. 3
Mechanized excavation, loading, transportation and unloading at new siding route no. 3
Read moreExcavation loading transportation and unloading at route4 loading yard for total quantity of 10lt of iron ore
Excavation, loading, transportation and unloading at route no 4 loading yard for total quantity of 10lt of iron ore fines slimes from fod techpro kirandul end to r4
Read moreExcavation, loading & transportation and staking of old dump fines at kalta irin mine, sail, kalta
Excavation, loading & transportation and staking of old dump fines at kalta irin mine, sail, kalta
Read moreLoading and transportation of fine slime lump ore for a quantity of 15 lt (20) in dry wet condition by mechanical means at fine ore dump mv siding kirandul
Loading and transportation of fine slime lump ore for a quantity of 15 lt (20) in dry wet condition by mechanical means at fine ore dump mv siding kirandul
Read moreExcavation, loading & transportation of 3.48 lakh te rom from meghahatuburu iron ore mines through 50 te pitless weighbridge (to be installed and maintained by contractor) to designated stockpile at an average lead distance of 1.10 km and unloading & leveling of rom at meghahatuburu iron ore mines ( miom).
Excavation, loading & transportation of 3.48 lakh te rom from meghahatuburu iron ore mines through 50 te pitless weighbridge (to be installed and maintained by contractor) to designated stockpile at an average lead distance of 1.10 km and unloading & leveling of rom at meghahatuburu iron ore mines ( miom).
Read moreExcavation, loading and transportation of iron ore rom
Excavation, loading and transportation of iron ore rom (0-900mm size) from working faces of dulki iron ore mine to crushing plants bunker/ surge pile of rajhara/ dalli and unloading the same, loading and transportation of intercalated waste (icw) / sub grade minerals from working faces to respective dump yards, including unloading and levelling. all operations are to be done by mechanized means.
Read moreLoading of iron ore into railway wagons and shifting & loading of tailing fines into railway wagon at siding of barsua iron mine
Loading of iron ore into railway wagons and shifting & loading of tailing fines into railway wagon at siding of barsua iron mine
Read moreLoading and transportation of fine slime lump ore for a quantity of 20 lt in dry wet condition by mechanical means at fine ore dump mv siding, kirandul within a lead of 1 km and in all lifts including unloading at loading yard
Loading and transportation of fine slime lump ore for 
 a quantity of 20 lt in dry wet condition by 
 mechanical means at fine ore dump mv siding, kirandul 
 within a lead of 1 km and in all lifts including unloading 
 at loading yard
Read moreof your Industry type