Tender Details
Particulars | Details |
---|---|
Title |
Excavation, Loading & Transportation Of 3.48 Lakh Te Rom From Meghahatuburu Iron Ore Mines Through 50 Te Pitless Weighbridge (To Be Installed And Maintained By Contractor) To Designated Stockpile At An Average Lead Distance Of 1.10 Km And Unloading & Leveling Of Rom At Meghahatuburu Iron Ore Mines ( Miom).
|
Description |
Excavation, Loading & Transportation Of 3.48 Lakh Te Rom From Meghahatuburu Iron Ore Mines Through 50 Te Pitless Weighbridge (To Be Installed And Maintained By Contractor) To Designated Stockpile At An Average Lead Distance Of 1.10 Km And Unloading & Leveling Of Rom At Meghahatuburu Iron Ore Mines ( Miom).
|
Organisation | Steel Authority of India Ltd | Public Sector Undertakings |
Tender Id | 99821 |
Reference Number |
BSL/JGOM/CC/07 of 2024-25 Dated 05/11/2024 |
Tender Fee | 0 |
EMD | 1 Lakh |
Tender Value | |
Place | Bokaro Steel Plant |
Link | https://sailtenders.co.in/sail.html |
Start Date | November 06, 2024 17:00 |
End Date |
27/11/2024 ( Expired 191 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Excavation and removal of 700000 te of rom/ore from hill no.1 and transporting the same to specified dump yard(pre-crusher stockpile) at a weighted average lead distance of 1.10 km .
Excavation and removal of 700000 te of rom/ore from hill no.1 and transporting the same to specified dump yard(pre-crusher stockpile) at a weighted average lead distance of 1.10 km .
Read moreMechanized excavation, loading, transportation and unloading of 5.00 (five) lakh tons of iron ore fines from dep. 10/11a fine ore stock pile to fine ore dump fod through nmdc weigh bridges in loading plant area
Mechanized excavation, loading, transportation and unloading of 5.00 (five) lakh tons of iron ore fines from dep. 10/11a fine ore stock pile to fine ore dump (fod) through nmdc weigh bridges in loading plant area at an average lead distance of 1.80-
Read moreExcavation, loading & transportation of 3.48 lakh te rom from meghahatuburu iron ore mines through 50 te pitless weighbridge (to be installed and maintained by contractor) to designated stockpile at an average lead distance of 1.10 km and unloading & leveling of rom at meghahatuburu iron ore mines ( miom).
Excavation, loading & transportation of 3.48 lakh te rom from meghahatuburu iron ore mines through 50 te pitless weighbridge (to be installed and maintained by contractor) to designated stockpile at an average lead distance of 1.10 km and unloading & leveling of rom at meghahatuburu iron ore mines ( miom).
Read moreof your Industry type