Tender Details
Particulars | Details |
---|---|
Title |
Construcation Of Rcc Minor Bridge 5x6 Meter Span Approach Road And Protection Work On Jagdishpur Sariya To Deoria 04 Lane In Km 12 To Majhna Nala At Distt Gorakhpur Lot No 1 Of 1
|
Description |
Construcation Of Rcc Minor Bridge 5x6 Meter Span Approach Road And Protection Work On Jagdishpur Sariya To Deoria 04 Lane In Km 12 To Majhna Nala At Distt Gorakhpur Lot No 1 Of 1
|
Organisation | Chief Engineer Gorakhpur Zone PWD Gorakhpur UP | State Govt. and UT |
Tender Id | 2025_CEGKP_1017297_1 |
Reference Number |
1339/135C-Gkp Circle/2025 Dated 20-02-2025 |
Tender Fee | 2714 |
EMD | 10.5 Lakh |
Tender Value | |
Place | Gorakhpur |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1833766 |
Start Date | March 13, 2025 14:30 |
End Date |
18/03/2025 ( Expired 56 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance work of jabalpur bhopal section of nh-12 from bareli to goharganj (bineka village) km. 193.000 to km. 255.300 to four lane with paved shoulder with provision of rigid pavement on epc mode under nhdp-iii (package iv) on the risk and cost o
Maintenance work of jabalpur bhopal section of nh-12 from bareli to goharganj (bineka village) km. 193.000 to km. 255.300 to four lane with paved shoulder with provision of rigid pavement on epc mode under nhdp-iii (package iv) on the risk and cost o
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreConstruction of approach road, additional approach road and protection work yamuna river bridge malav aligarh
Construction of approach road, additional approach road and protection work of 2-lane bridge at over yamuna river hasanpur district palwal (haryana) to malav -district aligarh (between uttar pradesh) marg in district aligarh (u.p.)
Read moreDesign, supply and fixing of pre-cast rcc box culvert size 2.00 m x 2.00 m (nhsl specification 7.45 mtr width) including earth work excavation, pcc bed and protection works between km 0.00 to km 14.350 on puwarti-gomaguda road
Design, supply and fixing of pre-cast rcc box culvert size 2.00 m x 2.00 m (nhsl specification 7.45 mtr width) including earth work excavation, pcc bed and protection works between km 0.00 to km 14.350 on puwarti-gomaguda road
Read moreConstruction of new banelli river bridge on km. 10 of the jaspur-dhampur road in bijnor, parallel to old existing bridge, approach roads and protection works in district bijnor.
Construction of new banelli river bridge on km. 10 of the jaspur-dhampur road in bijnor, parallel to old existing bridge, approach roads and protection works in district bijnor.
Read moreB.t. patch repair work on 1. kariya pater approach road length 1.27 km., chorkhari approach road length 0.60 km. (under pg of ag. no.158/a/2022-23) 2. aanandgarh road length 3.00 km. (under pg of ag. no.42/a/2018-19) 3.tala camp to ajmine road ch
B.t. patch repair work on 1. kariya pater approach road length 1.27 km., chorkhari approach road length 0.60 km. (under pg of ag. no.158/a/2022-23) 2. aanandgarh road length 3.00 km. (under pg of ag. no.42/a/2018-19) 3.tala camp to ajmine road ch
Read moreIe for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Read moreConstruction of minor bridge at hangarga khurd village at km 84.820 on nh161a kundral to wazar road section including its approach road on epc mode in the state of maharashtra total length including approach 0.361 km
Construction of minor bridge at hangarga khurd village at km 84.820 on nh161a kundral to wazar road section including its approach road on epc mode in the state of maharashtra total length including approach 0.361 km
Read moreCo road from upper dikalmukh to radhasso (8 km) sh widening cd work,protection work,payment work and 12 mtr bridge 1 no
Co road from upper dikalmukh to radhasso (8 km) sh widening cd work,protection work,payment work and 12 mtr bridge 1 no,pakke kessang district
Read moreWidening and strengthening from single lane to double lane of nalgonda town portion from km 0/0 - 1/0 in municipal limits, nalgonda - mushampally road from km 0/0 -12/0, mushampally - kannekal via dharmapuram km 0/0 -6/2 ( pr road) and mukundhapur - thipparthy road from km 16/0 -24/5 in nalgonda district ( sub work :- conducting sub soil investigation work for hlb at km 23/724 of mukundapur - thipparthy road )
Widening and strengthening from single lane to double lane of nalgonda town portion from km 0/0 - 1/0 in municipal limits, nalgonda - mushampally road from km 0/0 -12/0, mushampally - kannekal via dharmapuram km 0/0 -6/2 ( pr road) and mukundhapur - thipparthy road from km 16/0 -24/5 in nalgonda district ( sub work :- conducting sub soil investigation work for hlb at km 23/724 of mukundapur - thipparthy road )
Read moreof your Industry type