Tender Details
Particulars | Details |
---|---|
Title |
Construcation Of Rcc Minor Bridge 5x6 Meter Span Approach Road And Protection Work On Jagdishpur Sariya To Deoria 04 Lane In Km 12 To Majhna Nala At Distt Gorakhpur Lot No 1 Of 1
|
Description |
Construcation Of Rcc Minor Bridge 5x6 Meter Span Approach Road And Protection Work On Jagdishpur Sariya To Deoria 04 Lane In Km 12 To Majhna Nala At Distt Gorakhpur Lot No 1 Of 1
|
Organisation | Chief Engineer Gorakhpur Zone PWD Gorakhpur UP | State Govt. and UT |
Tender Id | 2025_CEGKP_1017297_1 |
Reference Number |
1339/135C-Gkp Circle/2025 Dated 20-02-2025 |
Tender Fee | 2714 |
EMD | 10.5 Lakh |
Tender Value | |
Place | Gorakhpur |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1833766 |
Start Date | March 13, 2025 14:30 |
End Date |
18/03/2025 ( Expired 34 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Read moreConstruction of minor bridge at hangarga khurd village at km 84.820 on nh161a kundral to wazar road section including its approach road on epc mode in the state of maharashtra total length including approach 0.361 km
Construction of minor bridge at hangarga khurd village at km 84.820 on nh161a kundral to wazar road section including its approach road on epc mode in the state of maharashtra total length including approach 0.361 km
Read moreConsultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.
Consultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.
Read moreSpecial repair work of km-5(250) and repair of 1x6.00 m span rcc culvert, approach road and special repair work of additional approach road in km-6 of samagra gram daheliya to samagra gram katri chhochhpur khurrampurwa remaining part road in district
Special repair work of km-5(250) and repair of 1x6.00 m span rcc culvert, approach road and special repair work of additional approach road in km-6 of samagra gram daheliya to samagra gram katri chhochhpur khurrampurwa remaining part road in district
Read moreConcrete work on lane no. 1, 2, 3, house no. 516 to muskan ever fresh and house no. 367 santosh sharma house to arjun kirana house no. 449 at sheetal nagar in ward no. 12 under zone no. 04
Concrete work on lane no. 1, 2, 3, house no. 516 to muskan ever fresh and house no. 367 santosh sharma house to arjun kirana house no. 449 at sheetal nagar in ward no. 12 under zone no. 04
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreSub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Read moreConstruction of wearing coat on all minor bridges and major bridge at ch. 25.005 on pengainganga river near masalapen two lane road with paved shoulders on nh 461 b from km. 0.00 to 36.845 in the state of maharashtra. (at risk and cost of contractor)
Construction of wearing coat on all minor bridges and major bridge at ch. 25.005 on pengainganga river near masalapen two lane road with paved shoulders on nh 461 b from km. 0.00 to 36.845 in the state of maharashtra. (at risk and cost of contractor)
Read moreConstruction of approach road, additional approach road and protection work malav aligarh
Construction of approach road, additional approach road and protection work of 2-lane bridge at over yamuna river hasanpur district palwal (haryana) to malav -district aligarh (between uttar pradesh) marg in district aligarh in distt- aligarh (up)
Read moreWork construction of bridge on aglad river in km 1 of satagard bend to gherachak dangasari ghuttu motor road in block jaunpur constituency dhanaulti district, t.g. under state sector (first phase work, design drawing, vetting, dpr preparation etc
Work construction of bridge on aglad river in km 1 of satagard bend to gherachak dangasari ghuttu motor road in block jaunpur constituency dhanaulti district, t.g. under state sector (first phase work, design drawing, vetting, dpr preparation etc
Read moreof your Industry type