Excavation For Pipe Line In Soil Mixed With Kankar With A Lift Up To 30m From The Trenches And Disp
Description
Organisation Urban Development Department Uttar Pradesh |
Tender Id GEM/2024/B/4683250
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date February 24, 2024 16:02
End Date
Expired 05/03/2024

Expired 953 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Awarded Contractor / Winner

Shri Enterprises

Contract Value

2482722

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: 8 Lakhs Experience with Gov. Required: Years
Buyer Name: Raj Kumar Sharma
Department: Urban Development Department Uttar Pradesh
Organisation: E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On EMD Status Status
1 HEDIS ASSOCIATES PRIVATE LIMITED - 05-03-2024 09:35:59 Offline upload Qualified
2 M/S YASH SHRI ENTERPRISES - 05-03-2024 09:10:05 Offline upload Qualified
3 Shri Enterprises - 05-03-2024 10:33:56 Offline upload Qualified

Financial Evaluation Results

S.No. Seller Name Offered Item Total Price Rank
1 Shri Enterprises Item Categories : Excavation for pipe line in soil mixed with kankar with a lift up to 30m from the trenches and disp 2482722.00 L1
2 M/S YASH SHRI ENTERPRISES Item Categories : Excavation for pipe line in soil mixed with kankar with a lift up to 30m from the trenches and disp 2545575.00 L2
3 HEDIS ASSOCIATES PRIVATE LIMITED Item Categories : Excavation for pipe line in soil mixed with kankar with a lift up to 30m from the trenches and disp 2548611.00 L3

Ordered Items & Contract Pricing

Product Brand Model Ordered Quantity Price
Excavation for pipe line in soil mixed with kankar with a lift up to 30m from the trenches and disposal of surplus earth within a distance of 60m as per attached specification NA BOQ Item 5 ₹ 1625.000
Excavation for pipe line in soil mixed with kankar with a lift up to 30m from the trenches and disposal of surplus earth within a distance of 60m as per attached specification NA BOQ Item 772 ₹ 250900.000
Supply of following size of pipe including all taxes at godown situated at district bulandshahr nagar palika parishad khurja 160m m dia PVC 6 kg per sqcm as per attached specification NA BOQ Item 998 ₹ 798400.000
supply of all specials for laying of above pipes including all taxes NA BOQ Item 1 ₹ 78000.000
cartage from store to site of work to the following pipes lowering them in to the trenches laying true the alignment and gradient and jointing and testing including as per attached specification NA BOQ Item 998 ₹ 66866.000
supply of all materials labour T and P etc All complete and inter connection exixting system with the proper distribution network at various points NA BOQ Item 1 ₹ 6050.000
Disposal Carting back of earth With in Municipal Limit up to a Distance of 8 km as per direction of engineer in carge NA BOQ Item 232 ₹ 39208.000
Dismantling of road for laying of pipeline including sorting out andstacking of servicable materials stacking and disposal of unservicable material upto a distance of 50m CC Interlocking tiles 80mm NA BOQ Item 798 ₹ 140448.000
Reinstatement of the following type of road dismantled during laying of pipe line including supply of all materials labour and T and P etc as per attached specification NA BOQ Item 798 ₹ 981540.000
provision for barricading with the help of G C Sheet ballies ropes flag signals and light signals as per requirement NA BOQ Item 115 ₹ 21275.000
Supply and Fixing Of Sluice Valve 110 mm Size NA BOQ Item 2 ₹ 33000.000
Site cleaning and other unforeseen material NA BOQ Item 1 ₹ 260.000
Construction of Stand Post NA BOQ Item 14 ₹ 63000.000
Site cleaning and other unforeseen material NA BOQ Item 1 ₹ 2150.000
Similar Tenders
Excavation of pits/ trenches for water supply pipeline repair and maintenance works

Excavation of pits/ trenches for water supply pipeline repair and maintenance works

Read more
Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of rcc pipe frommogha

Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of rcc pipe frommogha

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Earthwork for excavation of trenches for laying of hdpe ugps construction of pump room construction of sump well pumping system and electric work in pump room complete at stp kot shamir tehsil and district bathinda

Earthwork for excavation of trenches for laying of hdpe ugps construction of pump room construction of sump well pumping system and electric work in pump room complete at stp kot shamir tehsil and district bathinda

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Srlip-distributary package no.5-earthwork excavation, forming of embankment, providing cc lining and construction of cm and cd works of 20r distributary from km.15.500 at karivarigudem village of julurupadu (m) to km.57.285 at gollapalle (v) of laxmidevipalli (m) of bhadradrikothagudem district on main canal of sitarama lift irrigation project.

Srlip-distributary package no.5-earthwork excavation, forming of embankment, providing cc lining and construction of cm and cd works of 20r distributary from km.15.500 at karivarigudem village of julurupadu (m) to km.57.285 at gollapalle (v) of laxmidevipalli (m) of bhadradrikothagudem district on main canal of sitarama lift irrigation project.

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed