Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Excavation For Pipe Line In Soil Mixed With Kankar With A Lift Up To 30m From The Trenches And Disp
|
| Description |
|
| Organisation | Urban Development Department Uttar Pradesh | |
| Tender Id | GEM/2024/B/4652448 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | February 17, 2024 21:27 |
| End Date |
Expired
27/02/2024
Expired 960 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Shri Enterprises
2002323
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | Status |
|---|---|---|---|---|---|
| 1 | HEDIS ASSOCIATES PRIVATE LIMITED | - | 05-03-2024 07:09:32 | Offline upload | Qualified |
| 2 | M/S YASH SHRI ENTERPRISES | - | 05-03-2024 09:29:00 | Offline upload | Qualified |
| 3 | Shri Enterprises | - | 05-03-2024 10:04:21 | Offline upload | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | Shri Enterprises | Item Categories : Excavation for pipe line in soil mixed with kankar with a lift up to 30m from the trenches and disp | 2002323.00 | L1 |
| 2 | M/S YASH SHRI ENTERPRISES | Item Categories : Excavation for pipe line in soil mixed with kankar with a lift up to 30m from the trenches and disp | 2015727.00 | L2 |
| 3 | HEDIS ASSOCIATES PRIVATE LIMITED | Item Categories : Excavation for pipe line in soil mixed with kankar with a lift up to 30m from the trenches and disp | 2029274.00 | L3 |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| Excavation for pipe line in soil mixed with kankar with a lift up to 30m from the trenches and disposal of surplus earth as per attached Specificaiton | NA | BOQ Item | 5 | ₹ 1640.000 |
| Excavation for pipe line in soil mixed with kankar with a lift up to 30m from the trenches and disposal of surplus earth as per attached Specificaiton | NA | BOQ Item | 772 | ₹ 253216.000 |
| Supply of following size of pipe including all taxes at godown situated at district bulandshahr nagar palika parishad khurja 110mm dia as per attached Specificaiton | NA | BOQ Item | 998 | ₹ 407184.000 |
| supply of all specials for laying of above pipes including all taxes | NA | BOQ Item | 1 | ₹ 40700.000 |
| cartage from store to site of work to the following pipes lowering them in to the trenches laying true the alignment and gradient and jointing and testing including as per attached Specificaiton | NA | BOQ Item | 998 | ₹ 47904.000 |
| supply of all materials labour T and P etc All complete and inter connection exixting system with the proper distribution network at various points | NA | BOQ Item | 1 | ₹ 6100.000 |
| Disposal Carting back of earth With in Municipal Limit up to a Distance of 8 km as per direction of engineer in carge | NA | BOQ Item | 232 | ₹ 39440.000 |
| Dismantling of road for laying of pipeline including sorting out andstacking of servicable materials stacking and disposal of unservicable material uoto a distance of 50m CC Interlocking tiles 80mm | NA | BOQ Item | 798 | ₹ 145236.000 |
| Reinstatement of the following type of road dismantled during laying of pipe line including supply of all materials labour and T and P etc as per attached specification | NA | BOQ Item | 798 | ₹ 1002288.000 |
| provision for barricading with the help of GC Sheet ballies ropes flag signals and light signals as per requirement | NA | BOQ Item | 115 | ₹ 23345.000 |
| Supply and Fixing Of Sluice Valve 110 mm Size | NA | BOQ Item | 2 | ₹ 35000.000 |
| Site cleaning and other unforeseen material | NA | BOQ Item | 1 | ₹ 270.000 |
Excavation of pits/ trenches for water supply pipeline repair and maintenance works
Excavation of pits/ trenches for water supply pipeline repair and maintenance works
Read moreEarth work for excavation of trenches for laying of underground pipeline, lowering and jointing of rcc pipe frommogha
Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of rcc pipe frommogha
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreEarthwork for excavation of trenches for laying of hdpe ugps construction of pump room construction of sump well pumping system and electric work in pump room complete at stp kot shamir tehsil and district bathinda
Earthwork for excavation of trenches for laying of hdpe ugps construction of pump room construction of sump well pumping system and electric work in pump room complete at stp kot shamir tehsil and district bathinda
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreSrlip-distributary package no.5-earthwork excavation, forming of embankment, providing cc lining and construction of cm and cd works of 20r distributary from km.15.500 at karivarigudem village of julurupadu (m) to km.57.285 at gollapalle (v) of laxmidevipalli (m) of bhadradrikothagudem district on main canal of sitarama lift irrigation project.
Srlip-distributary package no.5-earthwork excavation, forming of embankment, providing cc lining and construction of cm and cd works of 20r distributary from km.15.500 at karivarigudem village of julurupadu (m) to km.57.285 at gollapalle (v) of laxmidevipalli (m) of bhadradrikothagudem district on main canal of sitarama lift irrigation project.
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreof your Industry type