Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Wbiw/Se/Wc Ii/Nit 05e/2023 24, Sl No. 03.
|
| Description |
Construction Of 5 Number Single Lane Rcc Bridge In Between Mouza Kundra Kapasda Etc Over Kalchiti Khal In Block Sabang And Dist. Paschim Medinipur In Connection With Construction Of 133 Numbers Of Rcc Bridgesas A Part Infrastructure Gap Project
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_IWD_538392_3 |
|
Reference Number |
WBIW/SE/WC-II/NIT-05e/2023-24. |
| Tender Fee | |
| EMD | 10 Lakh |
| Tender Value | |
| Place | MIDNAPORE |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | June 13, 2023 19:30 |
| End Date |
Expired
03/07/2023
Expired 1089 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Wbhidco/agm e-ii/ep/mtc./nit-03/2026-2027
Annual comprehensive maintenance and operation of sound and audio system at eco island in new town, kolkata. 12 (twelve) months.
Read moreComprehensive maintenance of ibb road id - 71 72 73 74 and 75 which exists in between bp no 988/4-s to 1027/2-s under tufanganj border fencing sub-division in west bengal and assam area during coming 3 years i.e. 2026-27, 2027-28 and 2028-29. sh ordinary repair, bridge repair and flood damage repair.
Read moreRepair/ renovation of the existing building to up uh and wc at land of udayan samity primery school, ward no-15.
Read moreUrgent repair works 1.00 kmp to 1.500 kmp in patches tengua-basulichak road under haldia construction sub-division no-i in the district of purba medinipur in the year 2026-2027. sl-03
Urgent repair works 1.00 kmp to 1.500 kmp in patches tengua-basulichak road under haldia construction sub-division no-i in the district of purba medinipur in the year 2026-2027.
Read moreWbiw/se/wc-ii/nit-05e/2023-24, sl no. 02.
Construction of 05 nos single lane rcc bridge a over gumrai khal and solatopa khal block- daspur- i and daspur-ii ps daspur dist - paschim medinipur in connection with construction of 133 numbers of rcc bridgesas a part infrastructure gap project
Read moreWbiw/se/wc-ii/nit-05e/2023-24, sl no. 01.
Construction of 04 nos single lane rcc bridge over bhasra khal in block ps debra and mouza barbasantapur over midnapore main canal in block kharagpur ii ps kharagpur local in the dist paschim medinipur
Read moreWbiw/se/wc-ii/nit-05e/2023-24, sl no. 04.
Construction of 5 number single lane rcc bridge banskona khal and amrakhali khal in block - sabang and dist. paschim medinipur in connection with construction of 133 numbers rcc bridges over drainage channels a part of infrastructure gap project
Read moreWbiw/se/wc-ii/nit-12e/2023-24 sl 03, 2nd call to e-nit no. wbiw/se/wc-ii/nit-08e/2023-24, sl 03.
Construction of 5 number single lane rcc bridge in between mouza kundra kapasda baharkundra kapasda kundra bural kapasda bural and gumai kapasda over kalchiti khal in block ps sabang and dist paschim medinipur
Read moreWbiw/se/wc-ii/nit-06e/2023-24 sl no. 01, 3rd call to e-nit no. wbiw/se/wc-ii/nit-05e/2022-23, sl no. 01
Construction of ten vent sluice across tamillya khal out falling to river darakeswar (jhumi) right bank at mouza-mansuka , gp-mansuka-i block and ps-ghatal , dist-paschim medinipur.
Read moreWbiw/se/wc-ii/nit-09e/2023-24 .sl no. 03.
Construction of bituminous road from sabang bazar to khaldhar road for a length of 3800 meter and premix carpeting for a length of 1200 meter over left embankment of river kapaleswari in in mouza-sabang narayanbarh block and ps-sabang
Read moreof your Industry type