Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🛢️ Expression Of Interest: Additional Top Loading T Ts For Bakania Depot, Bhopal 🚚 Indian Oil, A Central Government Ministry/Department, Is Seeking An Expression Of Interest (Eoi) From Potential Suppliers For The Induction Of Additional Top Loading Transporter Tank Trucks (T Ts) At The Ril Bakania Depot / Bpcl Bakania Depot In Bhopal. 📅 Submission Deadline: April 4, 2024, 3:00 Pm Interested Parties Are Invited To Submit Their Eoi Without Any Tender Fee Or Earnest Money Deposit (Emd). This Initiative Is Aimed At Enhancing The Logistical Capabilities At The Specified Depot. Keywords: Eoi, Top Loading T Ts, Transporter Tank Trucks, Indian Oil, Ril Bakania Depot, Bpcl Bakania Depot, Bhopal, Government Tender, Logistics, Oil And Gas Industry| Particulars | Details |
|---|---|
| Title |
Eoi For Induction Of Additional Top Loading T Ts At Bakania Depot Bhopal
|
| Description |
Expression On Interest For Induction Of Additional Top Loading Transporter Tank Trucks At Ril Bakania Depot / Bpcl Bakania Depot, Bhopal
|
| Organisation | IndianOil | Central Govt. Ministry/Department |
| Tender Id | 2024_MPSO_175968_1 |
|
Reference Number |
MPSO/Ops/Bakania/TT/EOI/2024 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | RIL Bakania Depot / BPCL Bakania Depot, Bhopal |
| Link |
View Original Tender Notice
https://iocletenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=186082 |
| Start Date | March 11, 2024 20:30 |
| End Date |
Expired
04/04/2024
Expired 921 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Automation integration of 8 bay bottom loading gantry and tlf pumps and associated instruments at bakania depot
Automation integration of 8 bay bottom loading gantry and tlf pumps and associated instruments at bakania depot
Read moreTender for road transportation of bulk petroleum products by top loading tank trucks- ms/ hsd/ branded fuels vashi terminal
Tender for road transportation of bulk petroleum products by top loading tank trucks- ms/ hsd/ branded fuels vashi terminal
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreEoi for induction of additional top loading tts at jayant depot.
Expression of interest for induction of additional top loading tank trucks at jayant depot.
Read moreEoi for induction of additional top loading tts at jabalpur depot.
Expression of interest for induction of additional top loading tank trucks at jabalpur depot.
Read moreLimited eoi for induction of top loading tts at pune terminal
Expression of interest for induction of bulk pol transport tank truck (top loading) at pune terminal in the existing contract
Read moreEoi for induction of additional bottom loading tts at ratlam terminal
Expression of interest for induction of additional bottom loading tank trucks at ratlam terminal.
Read moreof your Industry type