Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Installation Of Tubewell At Water Supply Scheme Theh Qalander Block And Distt. Fazilka
|
| Description |
Boring And Installing 200 Mm Dia Pvc Straight Tubewell 150 Mtr. Depth, Providing, Laying, Cutting, Jointing And Testing Of Pvc Pipe 10 Kg/Cm2 For Rising Main, Pumping Machinery And All Other Works Contingent Thereto. (Under Pidb/4215)
|
| Organisation | Water Supply and sanitation | State Govt. and UT |
| Tender Id | 2024_WSS_124935_1 |
|
Reference Number |
DWSS14(2024) Boring and Installing Tubewell at WSS Theh Qalander |
| Tender Fee | 1746 |
| EMD | 12649 |
| Tender Value | - |
| Place | Fazilka |
| Link |
View Original Tender Notice
https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=254249 |
| Start Date | August 06, 2024 21:30 |
| End Date |
Expired
21/08/2024
Expired 748 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Kishanganj water supply scheme under amrut 2.0
Kishanganj water supply scheme under amrut 2.0
Read moreAmrut-2.0-24x7-water supply scheme at edakkadu and adjacent places - part 2-pipeline work
Amrut-2.0-24x7-water supply scheme at edakkadu and adjacent places - part 2-pipeline work
Read moreSupply, installation, testing and commissioning of muffle furnace with n2 gas supply and accessories under pradhan mantri uchchatar shiksha abhiyan pm-usha scheme at karnatak university, dharwad
Supply, installation, testing and commissioning of muffle furnace with n2 gas supply and accessories under pradhan mantri uchchatar shiksha abhiyan pm-usha scheme at karnatak university, dharwad
Read moreSupply, installation, testing and commissioning of laboratory equipments and accessories for the departments of life sciences under pm-usha scheme at karnatak university dharwad
Supply, installation, testing and commissioning of laboratory equipments and accessories for the departments of life sciences under pradhan mantri uchchatar shiksha abhiyan pm-usha scheme at karnatak university dharwad
Read moreSupply, installation, testing and commissioning of particle size analyzer with zeta potential and accessories under pradhan mantri uchchatar shiksha abhiyan scheme at karnatak university, dharwad
Supply, installation, testing and commissioning of particle size analyzer with zeta potential and accessories under pradhan mantri uchchatar shiksha abhiyan pm-usha scheme at karnatak university, dharwad
Read moreSupply, installation, testing and commissioning of an impedance analyzer with accessories under the pradhan mantri uchchatar shiksha abhiyan pm-usha scheme at karnatak university, dharwad
Supply, installation, testing and commissioning of an impedance analyzer with accessories under the pradhan mantri uchchatar shiksha abhiyan pm-usha scheme at karnatak university, dharwad
Read moreDg ahilyanagar industrial area. m and r to centralized water supply scheme at ahilyanagar indl. area providing services for photo water meter reading, preparation and distribution of water bills, notices and other misc. works for 2 years period.
Dg ahilyanagar industrial area. m and r to centralized water supply scheme at ahilyanagar indl. area providing services for photo water meter reading, preparation and distribution of water bills, notices and other misc. works for 2 years period.
Read moreDg ranjangaon growth center. m and r to water supply schemes at ranjangaon. strengthening of bridge walkway, traction and suspender assemblies and flocculation clarifier tank structure etc for clf no. 1 and other misc works at water supply scheme, ra
Dg ranjangaon growth center. m and r to water supply schemes at ranjangaon. strengthening of bridge walkway, traction and suspender assemblies and flocculation clarifier tank structure etc for clf no. 1 and other misc works at water supply scheme, ra
Read moreSupply, installation, testing and commissioning of laboratory equipments and accessories for the department of forensic science and criminology under pm-usha scheme at karnatak university dharwad
Supply, installation, testing and commissioning of laboratory equipments and accessories for the department of forensic science and criminology under pradhan mantri uchchatar shiksha abhiyan pm-usha scheme at karnatak university dharwad
Read moreInstallation of tubewell at water supply scheme theh qalander block and distt. fazilka under pidb 4215
Boring and installing 200 mm dia pvc straight tubewell 150 mtr. depth, providing, laying, cutting, jointing and testing of pvc pipe 10 kg/cm2 for rising main, pumping machinery and all other works contingent thereto.
Read moreof your Industry type