Tender Details

Particulars Details
Title
Providing Mastic Asphalt Over The Dam Bridge Top And Part Portion Of Left Bank Approach Road Of Cps 1 Dam
Description
Providing Mastic Asphalt Over The Dam Bridge Top And Part Portion Of Left Bank Approach Road Of Cps 1 Dam
Organisation NHPC Limited | Central Govt. Ministry/Department
Tender Id 2025_NHPC_858908_1
Reference
Number
NH/CPS-1/PnC/W-1484/2024-25/ 36 Dated 05/05/2025
Tender Fee 590
EMD 33000
Tender Value
Place CHAMERA POWER STATION-KHAIRI, CHAMBA HP
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=903005
Start Date May 05, 2025 22:30
End Date

26/05/2025 ( Expired 13 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Read more
Rising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint

Rising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint

Read more
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Read more
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

Read more
One time improvement in bhoura town portion, shahpur town portion and padhar town portion on nh 69 (old) nh 46 (new) itarsi betul road in the state of madhya pradesh on epc mode

One time improvement in bhoura town portion, shahpur town portion and padhar town portion on nh 69 (old) nh 46 (new) itarsi betul road in the state of madhya pradesh on epc mode

Read more
(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.

(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.

Read more
Construction of h.l. steel bridge single span 42m c/c of bearing over narwana branch canal at rd 11862 x-ing chanarthal kalan to gt road sadhugarh via attapur including its approaches, dismantling and 1.5m span slab culvert under pmgsy-iii (batch-1)

Construction of h.l. steel bridge single span 42m c/c of bearing over narwana branch canal at rd 11862 x-ing chanarthal kalan to gt road sadhugarh via attapur including its approaches, dismantling and 1.5m span slab culvert under pmgsy-iii (batch-1)

Read more
Sopd_g_24_25_40 construction of road cum embankment on left bank of dikrong river (nh 15 at bahanibari to sissapathar bridge approach)( part 2 from ch. 11880.00m to 15140.00m) including approach roads under sopd g for the year 2024-25

Sopd_g_24_25_40 construction of road cum embankment on left bank of dikrong river (nh 15 at bahanibari to sissapathar bridge approach)( part 2 from ch. 11880.00m to 15140.00m) including approach roads under sopd g for the year 2024-25

Read more
Providing and laying c c flooring on internal roads road no 1 to 7 and 11 to 14 of ngm sabzi mandi hoshiarpur in market committee and district hoshiarpur

Providing and laying c c flooring on internal roads road no 1 to 7 and 11 to 14 of ngm sabzi mandi hoshiarpur in market committee and district hoshiarpur hsp_2025_023

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise