Tender Details

Particulars Details
Title
Construction Of Temporary Connecting Road (Left Bank To Song Dam Top) In Upstream Of Song Dam Distt. Dehradun.
Description
Construction Of Temporary Connecting Road (Left Bank To Song Dam Top) In Upstream Of Song Dam Distt. Dehradun.
Organisation MD - UPDCC Ltd. | State Govt. and UT
Tender Id 2026_UPDC4_94754_1
Reference
Number
01/DGM2/PIU_Song/2026-27
Tender Fee 5900
EMD 4.15 Lakh
Tender Value -
Place Sondhana Village
Link
View Original Tender Notice

https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=112102

Start Date May 08, 2026 16:30
End Date
Expired 15/05/2026

Expired 149 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of pushkar ghat on left bank of godavari river near velala v, jaipur (m, mancherial district.

Construction of pushkar ghat on left bank of godavari river near velala v, jaipur (m, mancherial district.

Read more
Construction of pushkar ghat on left bank of godavari river near luxettipet v and m, mancherial district.

Construction of pushkar ghat on left bank of godavari river near luxettipet v and m, mancherial district.

Read more
Junction widening at free left portions (i) at bvb junction towards fob (ii) at cvr channel free left (iii) at journalist colony junction (iv) at hdfc bank towards road 45, jubilee hills (v)at road no.45 towards checkpost near balakrishna residence, jubilee hills, ward-215 and 222, cir-36, khairatabad zone, ghmc (item.no3)

Junction widening at free left portions (i) at bvb junction towards fob (ii) at cvr channel free left (iii) at journalist colony junction (iv) at hdfc bank towards road 45, jubilee hills (v)at road no.45 towards checkpost near balakrishna residence, jubilee hills, ward-215 and 222, cir-36, khairatabad zone, ghmc (item.no3)

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Construction of temporary connecting road (left bank to song dam top) in upstream of song dam distt.- dehradun.

Construction of temporary connecting road (left bank to song dam top) in upstream of song dam distt.- dehradun.

Read more
Flood protection work for song dam colony site along the left bank of river song near village paled distt dehradun

Flood protection work for song dam colony site along the left bank of river song near village paled distt dehradun

Read more
Construction work of check dam on left bank nallah at upstream of uri-ii dam

Construction work of check dam on left bank nallah at upstream of uri-ii dam

Read more
Construction of office building for song dam drinking water project yamuna colony, distt- dehradun.

Construction of office building for song dam drinking water project yamuna colony, distt- dehradun. &amp#x0d

Read more
Repair of catch water drain constructed on left bank hill slope upstream of dam etc. chamera-ii power station

Repair of catch water drain constructed on left bank hill slope upstream of dam etc. chamera-ii power station

Read more
Repair of catch water drain constructed on left bank hill slope upstream of dam etc. chamera-ii power station

Repair of catch water drain constructed on left bank hill slope upstream of dam etc. chamera-ii power station

Read more