Tender Details
Particulars | Details |
---|---|
Title |
The Work Of Setting Up An Oxygenation Plnt In Pakka Talab.
|
Description |
The Work Of Setting Up An Oxygenation Plnt In Pakka Talab.
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_DOLBU_846849_19 |
Reference Number |
3276/JNV/E-NIVIDA such/2023-24 date 03.10.2023 |
Tender Fee | 4956 |
EMD | 3.9 Lakh |
Tender Value | |
Place | NPP Etawah |
Link | https://etender.up.nic.in |
Start Date | October 06, 2023 18:30 |
End Date |
13/10/2023 ( Expired 590 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreSelection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Selection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Read more6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
Read moreMaintenance dredging of mahanadi river channel of paradip port authority for the year 2025-26 to dredge a total in-situ quantity of 1.5 lakhs cu.mtr. up to its desired depth of 3.5 metre
Maintenance dredging of mahanadi river channel of paradip port authority for the year 2025-26 to dredge a total in-situ quantity of 1.5 lakhs cu.mtr. up to its desired depth of 3.5 metre
Read moreDevelopment, operation and maintenance of wayside amenities 3 o -m sites in uttar pradesh and 1 o-m site in odisha (4 o-m sites)nh-27/kushinagar-harihar pur/up
Development, operation and maintenance of wayside amenities 3 o -m sites in uttar pradesh and 1 o-m site in odisha (4 o-m sites)nh-27/kushinagar-gopalganj/ 355-202/rhs/ harihar pur/uttar pradesh
Read moreAllotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications
Allotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreThe work of raising the street and constructing the drainage and interlocking and interlocking repair from khalid house in bhadasa nayapura through rizwaah, munmun, and sukhnan shah mosque to nazir neta house.
The work of raising the street and constructing the drainage and interlocking and interlocking repair from khalid house in bhadasa nayapura through rizwaah, munmun, and sukhnan shah mosque to nazir neta house.
Read moreof your Industry type