Howrah division - tbr work under den/iii/hwh - 6.920 km bdc - kwae dn bb loop 3.870 - 4.060 = 0.190 km, 4.945 - 4.957 = 0.012 km, 7.902 - 8.105 = 0.203 km, 8.202 - 8.396 = 0.194 km, 8.720 - 8.849 = 0.129 km, 8.870 - 9.030 = 0.160 km, 16.210 - 16.292 = 0.082 km. bdc - kwae dn bb loop- 65.000 - 65.900 = 0.900 km,75.805 - 76.090 = 0.285 km, 78.785 - 79.200 = 0.415 km. bdc kwae dn bb loop 5.858 - 6.858 = 1.000 km. bdc kwae up bb loop 70.500 - 71.000 = 0.500 km, 50.400 - 50.850 = 0.450 km. dn bb lo
Ministry of Railways | Central Govt. Ministry/Department · Kolkata
- EMD
- ₹1.28 Lakh
- Tender fee
- ₹0
This tender closed on 05 Aug 2024.
Tender details
For complete deion and other details, please refer to tender
- Tender ID
- 76173978
- Reference number
- 114_2024-25
- Organisation
- Ministry of Railways | Central Govt. Ministry/Department
- Location
- Kolkata
- Bids open
- 16 Jul 2024, 5:46 PM
- Bids close
- 5 Aug 2024, 2:00 PM
- Tender value
- –
- EMD
- ₹1.28 Lakh
- Tender fee
- ₹0
Source: https://www.ireps.gov.in/ireps/works/pdfdocs/082024/76173978/viewNitPdf_4637574.pdf
Bid on the next howrah Division tender
Most bids fail on paperwork. Before the next one opens, we'll check your eligibility and get your registrations, digital signature (DSC) and documents ready.
Similar tenders
-
For complete deion and other details, please refer to tender
Ministry of Railways | Central Govt. Ministry/Department · Kolkata Closed 18 Jan 2024
View tender -
(i) Construction of new LHS in lieu of LC Gate No. 18/4 at Km 88/7-9 in BDC - KWAE section under AEN/KWAE. (ii)Construction of LHS in lieu of LC Gate No. 18/6/C/E at Km 89/21-23 and 89/24-22 (DN) in between station PTAE-AGAE in BB Loop under AEN/KWAE.(iii) Construction of new LHS in lieu of LC Gate No. 18/7/C/E at Km 91/7-9 in BDC - KWAE section under AEN/KWAE
Ministry of Railways Closed 28 Oct 2026
View tender -
For complete deion and other details, please refer to tender
Ministry of Railways | Central Govt. Ministry/Department · Kolkata Closed 10 Apr 2024
View tender -
Howrah division trr(p) -12.597 tkm in locations az - nfk up 179.880 - 181 = 1.120 km , kwae - az, az stn line-4 pf-4 177.222 - 177.720 = 0.498 km, bzle dn loop 0 - 0.845 = 0.845 km, dn 131 - 136 = 5 km , bdc - kwae dn 42.009 - 42.423 = 0.414 km, up 12.746 - 16 = 3.254 km, up 44.391 - 44.950 = 0.559 km, up 86.535 - 87.442 = 0.907 km & tbr -20.411 tkm in locations -kwae - az dn 132.325 - 132.500 = 0.175 km, up 142.400 - 143.300 = 0.900 km, 152.400 - 152.700 = 0.300 km, 152.800 - 153 = 0.200
For complete deion and other details, please refer to tender
Ministry of Railways | Central Govt. Ministry/Department · Kolkata Closed 18 Sep 2024
View tender -
Howrah division trr(p) -12.597 tkm in locations az - nfk up 179.880 - 181 = 1.120 km , kwae - az, az stn line-4 pf-4 177.222 - 177.720 = 0.498 km, bzle dn loop 0 - 0.845 = 0.845 km, dn 131 - 136 = 5 km , bdc - kwae dn 42.009 - 42.423 = 0.414 km, up 12.746 - 16 = 3.254 km, up 44.391 - 44.950 = 0.559 km, up 86.535 - 87.442 = 0.907 km & tbr -20.411 tkm in locations -kwae - az dn 132.325 - 132.500 = 0.175 km, up 142.400 - 143.300 = 0.900 km, 152.400 - 152.700 = 0.300 km, 152.800 - 153 = 0.200
For complete deion and other details, please refer to tender
Ministry of Railways | Central Govt. Ministry/Department · Kolkata Closed 11 Nov 2024
View tender -
HOWRAH DIVISION - TSR(P) - 29.861 TKM In location -HWH - BLY - UP -1.365-1.965 = 0.6 KM, 2.000-2.743= .743 KM ,HWH-BLY -UP CHORD - 6.00-8.66 = 2.66 KM ,BDC-SKG - DN - 40.500-46.902 = 6.402 KM ,BDC-KWAE-DN-17.144-20.034 = 2.89 KM ,KWAE-AZ-DN -142.00-148.00 = 6.00 KM , 150.00-153.00 = 3.00 KM , KAN-SNT -DN -27.022-30.294 = 3.272 KM , 39.063-41.914= 2.851 KM ,KAN-SNT-UP - 70.24-70.93= 0.69 KM , SNT-NHT -UP - 70.93 -71.683 = 0.753 KM by Contractor s own PQRSportals (2 Nos.) and gan
Ministry of Railways Closed 26 Oct 2026
View tender -
For complete deion and other details, please refer to tender
Ministry of Railways | Central Govt. Ministry/Department · Kolkata Closed 18 Mar 2024
View tender -
Strengthening of existing side pathway and replacement of corroded/perforated members like M.S chequered plate by SS antiskid chequred plates of gang way, side pathway, man refuse and tolly refuse of Br. No.12 UP, 20 UP , 51 UP, 83 UP, 91 DN, 105 DN, 106 DN, 11 DN, 168 A, 169, 171, 171A, 173, 174A, 179, 180A, 215, 217 and 230 in BB Loop and provision of new side pathway at Br.nos 2,5,6 in NH-BDC section & TPKR fly over of Howrah.
For complete description and other details, please refer to tender document.
Ministry of Railways Closed 4 Nov 2026
View tender -
Strengthening of existing side pathway and replacement of corroded /perforated members like M.S chequered plates by SS Antiskid chequered plates of gang way , side pathway ,man refuse and tolly refuse of Br. No.-12 UP, 20 UP, 51 A, 83 UP, 91 DN , 105 DN, 106 DN, 119 DN, 168 A, 169 , 171,171A, 173, 174 A, 179, 180 A ,215, 217 and 230 in BB Loop and provision of new path at Br. nos 2, 5, 6 in NH-BDC Section & TPKR Fly Over of Howrah Division.
For complete description and other details, please refer to tender document.
Ministry of Railways Closed 4 Nov 2026
View tender -
Painting of steel bridge girders of Br no. 8 Sampreeti bridge & Br no. 6 in NH -BDC section, Br. no. 12 SBG Loop Section, Br. no.149A Up, Rev & DN in HBC section, Br. No. 6 UP/DN 62 UP, 98, 104, 118, 129 & 142 in TAK section and Br.no.167 in AK LOOP section of Howrah Division.
For complete deion and other details, please refer to tender
Ministry of Railways | Central Govt. Ministry/Department · Kolkata Closed 25 Sep 2025
View tender