Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
State Plan 2024 25 Rwss To Aloor Thazhekad Replacing Damaged 200 Mm Ac Pumping Main With 225mm Pvc 10 Kg/Cm2 At Pathikkad In Aloor Panchayath Pipeline Work
|
Description |
State Plan 2024 25 Rwss To Aloor &Amp#X0d
Thazhekad Replacing Damaged 200 Mm Ac&Amp#X0d
Pumping Main With 225mm Pvc 10 Kg/Cm2 At Pathikkad In Aloor Panchayath Pipeline Work&Amp#X0d
|
Organisation | Kerala Water Authority | State Govt. and UT |
Tender Id | 2024_KWA_692629_1 |
Reference Number |
16/EE/ PHD/ IJK/2024-25 |
Tender Fee | 2760 |
EMD | 34124 |
Tender Value | |
Place | Aloor |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1078568 |
Start Date | September 26, 2024 21:30 |
End Date |
03/10/2024 ( Expired 259 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreLaying pvc di 160 mm od pipeline 8 inch and 6 inch ms pipeline polder type pump along with pumping machinery at booster phase 10 and booster for flats infront of manav mangal school phase 10 to improve pressure in the area h no 891 to 1100 of phase 9
Laying pvc di 160 mm od pipeline 8 inch and 6 inch ms pipeline polder type pump along with pumping machinery at booster phase 10 and booster for flats infront of manav mangal school phase 10 to improve pressure in the area h no 891 to 1100 of phase 9
Read moreDeposit work 2025 26 pwd bridgeslaying 110 mm pvc pipeline from upadeshikadavu to school in kadapra panchayath as part of utility shifting by pwd bridges division thiruvalla under nedumpuram section general civil work
Deposit work 2025 26 pwd bridgeslaying 110 mm pvc pipeline from upadeshikadavu to school in kadapra panchayath as part of utility shifting by pwd bridges division thiruvalla under nedumpuram section general civil work
Read moreConstruction and commissioning of 07 nos 200 mm dia tube wells with submersible pump sets etc. complete work in all types of strata including defect liability period of 02 years at various rwss/uwss of division neem ka thana
Construction and commissioning of 07 nos 200 mm dia tube wells with submersible pump sets etc. complete work in all types of strata including defect liability period of 02 years at various rwss/uwss of division neem ka thana
Read moreState plan-drw 2024-25-wss to cheekode and adjoining villages - replacing existing pumping main with 900mm di k9 pipes near rwph cheekkode
State plan-drw 2024-25-wss to cheekode and adjoining villages - replacing existing pumping main with 900mm di k9 pipes near rwph cheekkode
Read moreDeposit palluruthy block panchayath annual plan 2024 25 extending the existing 63 mm pvc pipe line at kadavath road and holymary convent road at ward 14 kumbalam panchayath pipeline work
Deposit palluruthy block panchayath&#x0d annual plan 2024 25 extending the existing 63&#x0d mm pvc pipe line at kadavath road and&#x0d holymary convent road at ward 14 kumbalam&#x0d panchayath pipeline work
Read moreState plan-2024-25 - cwss to alappad grama panchayath-dismantling of distribution pumping main carrying most dangerous old damaged panikkarkadavu iron bridge in alappad grama panchayath-
State plan-2024-25 - cwss to alappad grama panchayath-dismantling of distribution pumbing main carrying most dangerous old damaged panikkarkadavu iron bridge in alappad grama panchayath
Read moreKmc/ws/ee/s/092/2024-25/20/1st call
Development of f/water supply&#x0d by replacing very old,worn out and damaged 250 mm dia m.s main along with necessary road restoration at the&#x0d junction of raja s.c.mallick road and p.a.shah road to 41/b/2, gariahat road in ward- 92,br-x
Read more53/ee/mumbai-iv/2025-26
Replacing of damaged water supply main pipe line at kv school and miscellaneous work to cgh colony, spl, kane nagar in sector-i to iv, antop hill, mumbai-37 during 2025-26
Read moreAmrut.2 - karunagappally municipality.-uwss to karunagappally supplying,laying 500 mm di clear water pumping main from kolathumukku tank site to thacheyil mukku old tank site at karunagappally municipality.-pipeline work
Amrut.2 - karunagappally municipality.-uwss to karunagappally supplying,laying 500 mm di clear water pumping main from kolathumukku tank site to thacheyil mukku old tank site at karunagappally municipality.-pipeline work
Read moreof your Industry type