Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Anti Erosion Measures At Right Bank Of Dikrong River In Between 1st Km And 3rd Km To Protect Madhupur And Dahgharia Area From The Erosion Of River Dikrong.
|
| Description |
Anti Erosion Measures At Right Bank Of Dikrong River In Between 1st Km And 3rd Km To Protect Madhupur And Dahgharia Area From The Erosion Of River Dikrong.
|
| Organisation | Department of Water Resources | State Govt. and UT |
| Tender Id | 2025_DoWR_42489_1 |
|
Reference Number |
N LAKHIMPUR/2024-25/RIDF-II/II |
| Tender Fee | 8000 |
| EMD | 7.97 Lakh |
| Tender Value | - |
| Place | LAKHIMPUR |
| Link |
View Original Tender Notice
https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=68225 |
| Start Date | February 14, 2025 15:30 |
| End Date |
Expired
24/02/2025
Expired 544 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Removal of weeds and regrading the bed portion and cleaning of flood inlets and outlets at downstream of laxmipuram anicut from ls 114.80km to 116.30 inside the araniyar river in ponneri taluk of thiruvallur district
Removal of weeds and regrading the bed portion and cleaning of flood inlets and outlets at downstream of laxmipuram anicut from ls 114.80km to 116.30 inside the araniyar river in ponneri taluk of thiruvallur district
Read moreEngagement of user fee collection agency through regular basis (e-tender) for kovilvenni fee plaza at km 59.000 of nagapattinam to thanjavur section from km 1.600 to km 16.690 and fromkm 29.850 to km 80.133 of nh-83 in the state of tamil nadu
Engagement of user fee collection agency through regular basis (e-tender) for kovilvenni fee plaza at km 59.000 of nagapattinam to thanjavur section from km 1.600 to km 16.690 and fromkm 29.850 to km 80.133 of nh-83 in the state of tamil nadu
Read moreOnstruction of new 2-lane h.l. rcc bridge over river falgu including 4-lane trumpet in approach road in between kothwara bazar (nh-99, dobhi-chatra road) to integrated manufacturing cluster (imc) land acquire area near gamhariya samudayik bhawan and also rehabilitation of old existing 2-lane kothwara (bariya) bridge parallel to proposed alignment in district gaya, state-bihar on epc mode
Onstruction of new 2-lane h.l. rcc bridge over river falgu including 4-lane trumpet in approach road in between kothwara bazar (nh-99, dobhi-chatra road) to integrated manufacturing cluster (imc) land acquire area near gamhariya samudayik bhawan and also rehabilitation of old existing 2-lane kothwara (bariya) bridge parallel to proposed alignment in district gaya, state-bihar on epc mode
Read moreA. annual maintenance of mallandur holadagadde road from ch 0.00 to 1.50 and from 1.75 to 3.355 in chikmagalur taluk.b. annual maintenance work on the road from cnr pura road jakkanahalli avuthi via kanathi from km 0.00 to 14.50 km in chikmagalur taluk
A. annual maintenance of mallandur holadagadde road from ch 0.00 to 1.50 and from 1.75 to 3.355 in chikmagalur taluk.b. annual maintenance work on the road from cnr pura road jakkanahalli avuthi via kanathi from km 0.00 to 14.50 km in chikmagalur taluk
Read moreAnnual maintenance of devanur via chikkabanur road from ch 0.90 to 2.00 km in kadur taluk.annual maintenance of banavar sakrayapatna road via manjihalli road from ch 0.00 to 0.80 km of kadur taluk annual maintenance in k.m. road to brahma samudra road from ch 0.00 to 2.00 km in kadur taluk.annual maintenance of k.m. road to ranganathaswamy devasdan road from ch 0.00 to 1.80 km of kadur taluk. annual maintenance of bs road to s j road via nagenahalli 0.50 to 2.00 and 4.50 to 5.00km in kadur taluk
Annual maintenance of devanur via chikkabanur road from ch 0.90 to 2.00 km in kadur taluk.annual maintenance of banavar sakrayapatna road via manjihalli road from ch 0.00 to 0.80 km of kadur taluk annual maintenance in k.m. road to brahma samudra road from ch 0.00 to 2.00 km in kadur taluk.annual maintenance of k.m. road to ranganathaswamy devasdan road from ch 0.00 to 1.80 km of kadur taluk. annual maintenance of bs road to s j road via nagenahalli 0.50 to 2.00 and 4.50 to 5.00km in kadur taluk
Read moreDevelopment of road works at ward no 06 bhimasandra old village, constructing a culvert and drain at ward no 33 cm layout government school to the lake, correcting the drain bed and installing covering slabs at 1st, 2nd, and 3rd cross, as well as constructing drain at 7th cross in tumkur city corporation limits
Development of road works at ward no 06 bhimasandra old village, constructing a culvert and drain at ward no 33 cm layout government school to the lake, correcting the drain bed and installing covering slabs at 1st, 2nd, and 3rd cross, as well as constructing drain at 7th cross in tumkur city corporation limits
Read moreMetalling and asphalting road from abbihal road via asangi tota to kesaral tota road km 0.00 to 1.50 at abbihal village in athani taluka of belagavi dist.
Metalling and asphalting road from abbihal road via asangi tota to kesaral tota road km 0.00 to 1.50 at abbihal village in athani taluka of belagavi dist.
Read moreConstruction of a road and drain in ward no. 41 of motihari municipal corporation, extending from the government engineering college road to the masan mai temple—passing by the residences of dr. manish gupta and hemant gupta—and reaching the ghanauti river.
Construction of a road and drain in ward no. 41 of motihari municipal corporation, extending from the government engineering college road to the masan mai temple—passing by the residences of dr. manish gupta and hemant gupta—and reaching the ghanauti river.
Read moreRe asphalting road from ugar bk to parameshwarwadi road km 0.00 to 3.00 road at ugar bk village in kagwad taluka of belagavi dist.
Re asphalting road from ugar bk to parameshwarwadi road km 0.00 to 3.00 road at ugar bk village in kagwad taluka of belagavi dist.
Read moreConstruction of bidar city four lane ring road with median and street lights from veterinary university to shapur gate km. 1.33 to 2.33 (working reach 1.30 to 2.30) in bidar taluka
Construction of bidar city four lane ring road with median and street lights from veterinary university to shapur gate km. 1.33 to 2.33 (working reach 1.30 to 2.30) in bidar taluka
Read moreof your Industry type