Tender Details

Particulars Details
Title
Adss Optical Fibre Cable For Laying Along Power Line Alignments
Description
Organisation Department of Military Affairs | Ministry of Defence
Tender Id GEM/2024/B/4685579
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date February 24, 2024 02:48
End Date
Expired 26/02/2024

Expired 927 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: 1 Lakhs Experience with Gov. Required: Years
Ministry: Ministry Of Defence
Department: Department Of Military Affairs
Organisation: Indian Army

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On MSE/MII Status Status
1 M/S MAYTREYEE ENTERPRISE Make : NA Model : ADSS 24 FIBER 27-02-2024 10:45:23 N/A Qualified
2 M/S SHREE COMPUTER SYSTEMS Make : NA Model : ADSS 24 FIBER 28-02-2024 18:15:45 N/A Qualified

Financial Evaluation Results

S.No. Seller Name Offered Item Total Price Rank
1 M/S MAYTREYEE ENTERPRISE Item Categories : ADSS Optical Fibre Cable For laying along Power line alignments 436950.00 L1
2 M/S SHREE COMPUTER SYSTEMS Item Categories : ADSS Optical Fibre Cable For laying along Power line alignments 530000.00 L2
Similar Tenders
Establishing 2x12.5mva, 66/11kv sub-station at paduvalahippe village along with construction of 66kv lilo line on 110kv dc towers using coyote conductor for a distance of 1.520km

Establishing 2x12.5mva, 66/11kv sub-station at paduvalahippe village along with construction of 66kv lilo line on 110kv dc towers using coyote conductor for a distance of 1.520km from the existing 66kv kadavinakote-hanagarahally-hassan line-1 to proposed padavalahippe substation in holenarasipura taluk, hassan district on partial turnkey basis including supply of all materials/equipments (excluding supply of 2x12.5mva 66/11kv power transformers and 11kv switchgear) and erection (including civil works) of all materials/equipments, testing and commissioning.

Read more
Tempo travellers 14 plus 1 seater along with driver and gps tracker for shivanasamudra tli section

Providing vehicle services of tempo travellers (14 plus 1) seater along with driver and gps tracker for maintenance of transmission lines coming under shivanasamudra section of mandya operation division, mysuru transmission zone on hire basis

Read more
Tempo travellers 14 plus 1 seater along with driver and gps tracker for mandya tli section

Providing vehicle services of tempo travellers (14 plus 1) seater along with driver and gps tracker for maintenance of transmission lines coming under mandya section of mandya operation division, mysuru transmission zone on hire basis

Read more
Tempo travellers 14 plus 1 seater along with driver and gps tracker for mysuru tli-1 section

Providing vehicle services of tempo travellers (14 plus 1) seater along with driver and gps tracker for maintenance of transmission lines coming under mysuru tli-1 section of hootagally operation division, mysuru transmission zone on hire basis

Read more
Tempo travellers 14 plus 1 seater along with driver and gps tracker for kr nagara tli section

Providing vehicle services of tempo travellers (14 plus1) seater along with driver and gps tracker for maintenance of transmission lines coming under k.r.nagara tli section of hootagally operation division, mysuru transmission zone on hire basis

Read more
Establishing 2x20mva, 110/11kv sub-station at adakalabandi (kodala) and construction of 110kv dc line using panther conductor from existing 110kv gondadagi sub-station to the proposed 110/11kv sub-station at adakalabandi(kodala) for a distance of about 7.907km in wadagera taluk, yadgir district

Establishing 2x20mva, 110/11kv substation at adakalabandi(kodala) along with construction of 110kv dc line from existing 110kv gondadagi substation to proposed 110/11kv adakalabandi sub-station for a distance of 7.907 kms and construction of 2nos of terminal bay at 110kv gongadagi substation in wadegera taluk, yadgir district on partial turnkey basis including supply of all matching materials/equipments (excluding supply 11kv switchgear) and erection (including dismantling and civil works) of all materials/ equipment, testing and commissioning

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise