Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Comprehensive Repair And Maintenance To Various Roads Under Sub Division Iii Of Division South Road Ii, Pwd During 2023 24 And 2024 25. (Sh Minor Repairing Of Footpath And Central Verge.)
|
| Description |
Comprehensive Repair And Maintenance To Various Roads Under Sub Division Iii Of Division South Road Ii, Pwd During 2023 24 And 2024 25. (Sh Minor Repairing Of Footpath And Central Verge.)
|
| Organisation | Public Works Department | State Govt. and UT |
| Tender Id | 2024_PWD_253104_1 |
|
Reference Number |
78/EE/PWD Divn. South Road-II/23-24 |
| Tender Fee | 0 |
| EMD | 1.22 Lakh |
| Tender Value | - |
| Place | Sub Division-3 |
| Link |
View Original Tender Notice
https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330960 |
| Start Date | February 03, 2024 17:20 |
| End Date |
Expired
12/02/2024
Expired 972 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Am to roads of achampet section package-iii for the year 2026-27 in nagarkurnool district. (roads in package: 1. mahabubnagar - mannanur road from km 82/0 to 96/400) 2nd call - reserved for sc only.
Am to roads of achampet section package-iii for the year 2026-27 in nagarkurnool district. (roads in package: 1. mahabubnagar - mannanur road from km 82/0 to 96/400) 2nd call - reserved for sc only.
Read moreOperation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws)
Operation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality) iv.) ward level piped water supply schemes in non quality affected wards (wls_non quality) , i.e. the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in blocks:- 08 total no. of schemes: 280 wls(non quality): 226 wls(quality): 05 pws (non quality): 35 svs (non quality): 14
Read more(i)construction of road median from plot no.550m to ttd temple exit gate near bsnl quarters (ii) laying of cc road m30 grade infront of bsnl quarters (iii) laying of footpath from plot no.550m to ttd temple exit gate (iv) construction of compound wall to bsnl quarters at road no.92, jubilee hills, ward-222, film nagar, cir-36, jubilee hills, khairatabad zone, ghmc (item.no 3)
(i)construction of road median from plot no.550m to ttd temple exit gate near bsnl quarters (ii) laying of cc road m30 grade infront of bsnl quarters (iii) laying of footpath from plot no.550m to ttd temple exit gate (iv) construction of compound wall to bsnl quarters at road no.92, jubilee hills, ward-222, film nagar, cir-36, jubilee hills, khairatabad zone, ghmc (item.no 3)
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreGr no-01 comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-10 schemes), ii.) ward level piped water supply schemes in quality affected wards (wls_quality-70 schemes) and iii.) ward level piped water supply schemes in non quality affected wards(wls_non quality-359 schemes) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
Gr no-01 comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-10 schemes), ii.) ward level piped water supply schemes in quality affected wards (wls_quality-70 schemes) and iii.) ward level piped water supply schemes in non quality affected wards(wls_non quality-359 schemes) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
Read moreComprehensive repair and maintenance to various roads under sub division - iii of division south road-ii, pwd during 2024-25. (sh_ minor repairing of footpath and central verge.)
Omprehensive repair and maintenance to various roads under sub division - iii of division south road-ii, pwd during 2024-25. (sh_ minor repairing of footpath and central verge.)
Read moreComprehensive repair and maintenance to various roads under sub division - i of division south road-ii, pwd during 2024-25. (sh_ minor repairing of footpath and central verge.)
Comprehensive repair and maintenance to various roads under sub division - i of division south road-ii, pwd during 2024-25. (sh_ minor repairing of footpath and central verge.)
Read moreComprehensive repair and maintenance to various roads under sub division - iv of division south road-ii, pwd during 2024-25. (sh_ minor repairing of footpath and central verge.)
Comprehensive repair and maintenance to various roads under sub division - iv of division south road-ii, pwd during 2024-25. (sh_ minor repairing of footpath and central verge.)
Read moreComprehensive repair and maintenance to various roads under sub division - ii of division south road-ii, pwd during 2024-25. (sh_ minor repairing of footpath and central verge.)
Comprehensive repair and maintenance to various roads under sub division - ii of division south road-ii, pwd during 2024-25. (sh_ minor repairing of footpath and central verge.)
Read moreComprehensive repair and maintenance to various roads under sub division - i of division south road-ii, pwd during 2023-24 and 2024-25. (sh_ minor repairing of footpath and central verge.)
Comprehensive repair and maintenance to various roads under sub division - i of division south road-ii, pwd during 2023-24 and 2024-25. (sh_ minor repairing of footpath and central verge.)
Read moreof your Industry type