Tender Details

Particulars Details
Title
Dismantling, Manual Transportation (30 Meter Manually Approx.), Loading, Transportation (Track Line) And Unloading Of 02 Nos Of 55 Kw, 800mm Belt Conveyor (53 Ln/1 D 0 D N 50 Ln/2 R 3 R) Complete With Electrical And Dismantling, Manual.... At Tawa Ii
Description
Dismantling, Manual Transportation (30 Meter Manually Approx.), Loading, Transportation (Track Line) And Unloading Of 02 Nos Of 55 Kw, 800mm Belt Conveyor (53 Ln/1 D 0 D N 50 Ln/2 R 3 R) Complete With Electrical And Dismantling, Manual.... At Tawa Ii
Organisation Western Coalfields Limited | Public Sector Undertakings
Tender Id 2025_WCL_340767_1
Reference
Number
PK3550-ENM-0052-2025-26
Tender Fee 0
EMD 4400
Tender Value -
Place Pathakhera Area, Distt.- Betul (M.P.)
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=353251

Start Date August 03, 2025 22:30
End Date
Expired 13/08/2025

Expired 428 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Dismantling and transportation of 02 no. of 55kw and 01 no. 22 kw 800mm belt conveyor and dismantling, loading, transportation, unloading and installation of 01 no. 55kw and 01 no. 22kw 800mm belt conveyor complete with electrical accessories

Dismantling and transportation of 02 no. of 55kw and 01 no. 22 kw 800mm belt conveyor and dismantling, loading, transportation, unloading and installation of 01 no. 55kw and 01 no. 22kw 800mm belt conveyor complete with electrical accessories

Read more
Construction of (i) 02 nos.ug sub station at 3d/0l and 2l 17l/1d and 2d (ii)one nos. retaining wall at 1l bet 0d and -1d (in bottom seam) and 4nos (top seam) (iii)one air crossing 3r/15l (in bottom seam) of haldibari ug mine

Construction of (i) 02 nos.ug sub station at 3d/0l and 2l 17l/1d and 2d (ii)one nos. retaining wall at 1l bet 0d and -1d (in bottom seam) and 4nos (top seam) (iii)one air crossing 3r/15l (in bottom seam) of haldibari ug mine

Read more
Fabrication and supply of wooden boxes racks required for packaging transportation of lp rotor blade sets 2l 2r and 3l 3r of 210 mw unit 6 ptps panipat

Fabrication and supply of wooden boxes racks required for packaging transportation of lp rotor blade sets 2l 2r and 3l 3r of 210 mw unit 6 ptps panipat

Read more
Transportation/installation of 01 nos 800 mm size single drive head, extension/installation of pony belt conveyor from 34le/19d to 34le/0d (400m), dismantling and transportation of electrical equipment 31lw panel, dismantling and transporting of 800

Transportation/installation of 01 nos 800 mm size single drive head, extension/installation of pony belt conveyor from 34le/19d to 34le/0d (400m), dismantling and transportation of electrical equipment 31lw panel, dismantling and transporting of 800

Read more
Dismantling, manual transportation (50 meter manually approx.), loading, transportation (track line) and unloading of 840m, 1000mm (6ls/bd-13d 5ln/bd-11d) belt structure and extracting, manual transportation (50 meter manually approx.), loading, t

Dismantling, manual transportation (50 meter manually approx.), loading, transportation (track line) and unloading of 840m, 1000mm (6ls/bd-13d 5ln/bd-11d) belt structure and extracting, manual transportation (50 meter manually approx.), loading, t

Read more
Dismantling, loading, transportation (manual and through haulage) of 01 no. udm from 1-2d/54ls and 03 nos. lhd from 0d/54ln, 29d/21ln and 52ln/6d lws respectively to surface and unloading on surface of tawa-ii mine, pathakhera area.

Dismantling, loading, transportation (manual and through haulage) of 01 no. udm from 1-2d/54ls and 03 nos. lhd from 0d/54ln, 29d/21ln and 52ln/6d lws respectively to surface and unloading on surface of tawa-ii mine, pathakhera area.

Read more
Loading, transportation, unloading and installation of 01 no. 55kw, 800mm belt conveyor complete with electrical accessories from 53ls/2d to 50ln/6r lws and 01 no. of 22 kw, 800mm pony belt conveyor with electrical accessories at tawa-ii mine of pkd.

Loading, transportation, unloading and installation of 01 no. 55kw, 800mm belt conveyor complete with electrical accessories from 53ls/2d to 50ln/6r lws and 01 no. of 22 kw, 800mm pony belt conveyor with electrical accessories at tawa-ii mine of pkd.

Read more
Dismantling, foundation work and fitting of 2r/-1l pit bottom haulage for rectification of damaged bedframe structure and concrete foundation for smooth coal and material transportation at pit no. 2 under pandaveswar colliery, pandaveswar area

Dismantling, foundation work and fitting of 2r/-1l pit bottom haulage for rectification of damaged bedframe structure and concrete foundation for smooth coal and material transportation at pit no. 2 under pandaveswar colliery, pandaveswar area

Read more
Dismantling, foundation work and fitting of 2r/-1l pit bottom haulage for rectification of damaged bedframe structure and concrete foundation for smooth coal and material transportation at pit no. 2 under pandaveswar colliery, pandaveswar area

Dismantling, foundation work and fitting of 2r/-1l pit bottom haulage for rectification of damaged bedframe structure and concrete foundation for smooth coal and material transportation at pit no. 2 under pandaveswar colliery, pandaveswar area

Read more
Dismantling, loading on trolley, transportation from khottadih colliery to pandaveswar colliery and fitting of mamc make 90 hp direct haulage at pit no 2 for replacement of existing data make 15 no haulage at 14l/1d under pandaveswar colliery

Dismantling, loading on trolley, transportation from khottadih colliery to pandaveswar colliery and fitting of mamc make 90 hp direct haulage at pit no 2 for replacement of existing data make 15 no haulage at 14l/1d under pandaveswar colliery

Read more