Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Rcc Bridge Rob With Steel Composite Girder And Allied Works At Madathimoola In Kerala For Cochin International Airport Ltd
|
| Description |
Construction Of Rcc Bridge Rob With Steel Composite Girder And Allied Works At Madathimoola In Kerala For Cochin International Airport Ltd
|
| Organisation | RITES Ltd. | Public Sector Undertakings |
| Tender Id | 2025_RITES_240085_1 |
|
Reference Number |
RITES/BLR/CIALMADATHIMOOLA |
| Tender Fee | 14160 |
| EMD | 21.04 Lakh |
| Tender Value | - |
| Place | Madathimoola Kerala |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=273239 |
| Start Date | July 15, 2025 16:30 |
| End Date |
Expired
24/07/2025
Expired 451 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreReplacement of bridge girder including bearing in br. no 18a rob (1x12.2m) b/w crp-dgd under sse/br/dhn.
Replacement of bridge girder including bearing in br. no 18a rob (1x12.2m) b/w crp-dgd under sse/br/dhn.
Read more1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
Read more1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:
1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:
Read morePeriodical painting of steel girder bridge of br. no.06- east line (rail viaduct composite girder spans 16x31.6m+23x29.776m+5x31.458m+1x31.708m) at km-08/32-10/24 between stations ppta - phlg and ten(10) spans (span no. 01 to 10) of bridge no. 07(2x64+36x119.6m) at km 10/42-15/24 between stations ppta - phlg of danapur division under dy.ce/brl/hjp.
Periodical painting of steel girder bridge of br. no.06- east line (rail viaduct composite girder spans 16x31.6m+23x29.776m+5x31.458m+1x31.708m) at km-08/32-10/24 between stations ppta - phlg and ten(10) spans (span no. 01 to 10) of bridge no. 07(2x64+36x119.6m) at km 10/42-15/24 between stations ppta - phlg of danapur division under dy.ce/brl/hjp.
Read moreConstruction of road over bridge no: 114 (span: 1x18.0m cg+1x60.m camel back truss girder+1x18.0m composite girder) at project chainage 80028 in badampahar yard in connection with construction of new line in between kendujhargarh - badampahar section under the jurisdiction of dy. ce/con/tata of s. e. railway.
Construction of road over bridge no: 114 (span: 1x18.0m cg+1x60.m camel back truss girder+1x18.0m composite girder) at project chainage 80028 in badampahar yard in connection with construction of new line in between kendujhargarh - badampahar section under the jurisdiction of dy. ce/con/tata of s. e. railway.
Read moreProviding and fixing of m.s. grating in place of rcc road gullies and other allied works thereto near at entrance gate of composite hospital, itbp, behlana, u.t., chandigarh.
Providing and fixing of m.s. grating in place of rcc road gullies and other allied works thereto near at entrance gate of composite hospital, itbp, behlana, u.t., chandigarh.
Read moreInspection of 01 no. bridge and 04 no. of bow string girder robs of gc section of ddu division using high resolution image &video capture uav drone under sse/br/ddu. (br no.345/dn between station gaya-mpo at km-466/21-467/15, and bow string girder spans of robs (1x60m) between dos-phe at km-556/25-27, rob(1x60m) in bet. station phe-kwd at km-562/11-13, rob(1x60m) phe-kwd at km-564/19-21,rob(1x60m) between kwd-ssm at km-566/19-21).
Inspection of 01 no. bridge and 04 no. of bow string girder robs of gc section of ddu division using high resolution image &video capture uav drone under sse/br/ddu. (br no.345/dn between station gaya-mpo at km-466/21-467/15, and bow string girder spans of robs (1x60m) between dos-phe at km-556/25-27, rob(1x60m) in bet. station phe-kwd at km-562/11-13, rob(1x60m) phe-kwd at km-564/19-21,rob(1x60m) between kwd-ssm at km-566/19-21).
Read moreRebuilding of major bridge, no39 (5 x18.30 m as compositewelded girder) at km 24/26-30and major bridge no 40 (4 x18.30m as composite weldedgirder) at km 25/4-8 along-withdismantling of existing archbridges between harauni-jaitipurin lucknow-kanpur section undermission raftaar project under dyce/c-iv/lucknow, northernrailway
Rebuilding of major bridge, no39 (5 x18.30 m as compositewelded girder) at km 24/26-30and major bridge no 40 (4 x18.30m as composite weldedgirder) at km 25/4-8 along-withdismantling of existing archbridges between harauni-jaitipurin lucknow-kanpur section undermission raftaar project under dyce/c-iv/lucknow, northernrailway
Read moreof your Industry type