Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Limited Span And Limited Width Rob In Lieu Of Manned Lc No. Bk 60 At Km 1085/3 4 In Btc Kge Section.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 72601382 |
|
Reference Number |
CPM-GSU-18-NGP-2023-24 |
| Tender Fee | 0 |
| EMD | 9.05 Lakh |
| Tender Value | - |
| Place | Bilaspur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/012024/72601382/viewNitPdf_4427127.pdf |
| Start Date | December 15, 2023 22:18 |
| End Date |
Expired
09/01/2024
Expired 1012 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Proposed construction of rob for elimination of manned lc at lc no. 554 at km 1098/33-35 between chcr (chacher)-sal(salwa) block section.
Proposed construction of rob for elimination of manned lc at lc no. 554 at km 1098/33-35 between chcr (chacher)-sal(salwa) block section.
Read moreConstruction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Construction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Read moreClosure of manned lc no. tb-6 at km 330/15-331/1 by providing diversion road to newly constructed sub-way at lc no. tb-8 and closure of lc no. am-41 at km 332/16-17 by providing diversion road to nhs in lieu of manned lc no. am-42 between vaa-lyd in adra division.
Closure of manned lc no. tb-6 at km 330/15-331/1 by providing diversion road to newly constructed sub-way at lc no. tb-8 and closure of lc no. am-41 at km 332/16-17 by providing diversion road to nhs in lieu of manned lc no. am-42 between vaa-lyd in adra division.
Read moreOhe modification work in connection with provision of new rob in lieu of lc gate no. nn-105 at kamg nunder aden/east/apdj.
Ohe modification work in connection with provision of new rob in lieu of lc gate no. nn-105 at kamg nunder aden/east/apdj.
Read moreS&t work inconnection with provision of 2-lane road over bridge (rob) in lieu of lc no: 116 at km: 933/08-10 between gurla-keshorai patan stations .[2026]
S&t work inconnection with provision of 2-lane road over bridge (rob) in lieu of lc no: 116 at km: 933/08-10 between gurla-keshorai patan stations .[2026]
Read moreConstruction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Construction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Read moreSr (special repair) work providing safety railing on 2-lane rob and its approaches in lieu of existing level crossing (lc no. c-61) at km 165.550 on nh-89 in nagaur city
Sr (special repair) work providing safety railing on 2-lane rob and its approaches in lieu of existing level crossing (lc no. c-61) at km 165.550 on nh-89 in nagaur city
Read moreConstruction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreCarrying out site survey, geo-technical investigation, preparation of preliminary alignment design and general arrangement drawing (gad) for construction of road over bridge (rob) in lieu of 12 nos. level crossing (lc) gate over konkan railway.
Carrying out site survey, geo-technical investigation, preparation of preliminary alignment design and general arrangement drawing (gad) for construction of road over bridge (rob) in lieu of 12 nos. level crossing (lc) gate over konkan railway.
Read moreof your Industry type