Tender Details
Particulars | Details |
---|---|
Title |
Signalling Work Including Alteration In Electronic Interlocking (Kyosan Make) And Outdoor Work In Udhna Yard Remodeling &Amp Udhna Surat 3rd Line In Mumbai Division Of Western Railway.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 75431202 |
Reference Number |
SG-216-2-104-WA |
Tender Fee | 0 |
EMD | 2.58 Lakh |
Tender Value | |
Place | Mumbai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/102024/75431202/viewNitPdf_4590249.pdf |
Start Date | October 04, 2024 23:39 |
End Date |
30/10/2024 ( Expired 175 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of cc road overlay work over existing old cc road and underground pipe drainage line work at different wards in nagar parishad mhowgaon under cm infra 4th phase - 3rd call
Construction of cc road overlay work over existing old cc road and underground pipe drainage line work at different wards in nagar parishad mhowgaon under cm infra 4th phase&#x0d - 3rd call&#x0d
Read moreExpansion of new pipe
Expansion of new pipe&#x0d line net work line network in uncovered area and improvement of existing distribution network in jal shakti phe sub division kunjwani under amrut 2.0&#x0d
Read moreSantragachi mohiary road from 1.00 km to 5.00 km, restoration work of kmda cutting for new drinking water pipe line and repair of leakage of howrah highway sub-division under howrah highway division in the dist. of howrah during the year 2024-2025
Santragachi mohiary road from 1.00 km to 5.00 km, restoration work of kmda cutting for new drinking water pipe line and repair of leakage of howrah highway sub-division under howrah highway division in the dist. of howrah during the year 2024-2025
Read moreCapacity increasing of transformer, construction of lt abc line and other work in scheme nagar
Capacity increasing of transformer, construction of lt abc line and other work in scheme nagar&#x0d nikay 2024-25
Read moreWork for removal of leakage in various size and type pipe line under rwss sub division reodar, division aburoad
Work for removal of leakage in various size and type pipe line under rwss sub division reodar, division aburoad
Read moreRepair and re construction work of jamak canal damaged by the under construction kamar motor road of pmgsy division uttarkashi in bhatwadi block distt-uttarkashi (reach -0.00 km to 1.000 km)
Repair and re construction work&#x0d of jamak canal damaged by the under&#x0d construction kamar motor road of&#x0d pmgsy division uttarkashi in&#x0d bhatwadi block distt-uttarkashi (reach&#x0d -0.00 km to 1.000 km)
Read moreConstruction and commissioning of 01 no 200mm dia tubewell with
Construction and commissioning of 01 no 200mm dia tubewell with &#x0d 02 years defect liability period at uwss behror and depeening of 02 &#x0d no tubewells at subdivision neemrana under emergent work for &#x0d summer 2025 in the jurisdiction of division behror
Read moreIn ward number 21, in front of malwalon ki dhani and pappu saini and in front of musania baba platform and other interlocking tile work
In ward number 21, in front of malwalon ki dhani and pappu saini and in front of musania baba platform and other interlocking tile work&#x0d
Read moreRenovation and repairing work to c block (c3) 12 nos. flats including roof treatment at kaljani r.h.e. complex in the district of alipurduar under siliguri division.
Renovation and repairing work to&#x0d c block (c3) 12 nos. flats&#x0d including roof treatment at&#x0d kaljani r.h.e. complex in the&#x0d district of alipurduar under&#x0d siliguri division.
Read moreThe work of sitc of trash boom attached with pontoon mounted conveyor system to collect remove and disposal of floating material from various nallas in western suburb in mumbai including on m of 5 years
The work of sitc of trash boom attached with pontoon mounted conveyor system to collect remove and disposal of floating material from various nallas in western suburb in mumbai including on m of 5 years
Read moreof your Industry type