Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Outdoor Signaling Works At Kzj Yard In Connection With The 3rd Line Works In Kzj Bpq Section
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 79862996 |
|
Reference Number |
C_SG_C_36_5_399 |
| Tender Fee | 0 |
| EMD | 12.59 Lakh |
| Tender Value | - |
| Place | Secunderabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/032025/79862996/viewNitPdf_4851922.pdf |
| Start Date | February 08, 2025 03:23 |
| End Date |
Expired
17/03/2025
Expired 579 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Bpq-kzj section: provision of goods loading line at manikgarh in down direction towards balharshah end in kazipet-balharshah section.
Bpq-kzj section: provision of goods loading line at manikgarh in down direction towards balharshah end in kazipet-balharshah section.
Read morePart supply of signaling material, installation, testing & commissioning of signaling works in connection with the construction/upgradation of tracks, bridges, level crossings, robs/rubs, yard remodeling, and other engineering works at various locations in ahmedabad division.
Part supply of signaling material, installation, testing & commissioning of signaling works in connection with the construction/upgradation of tracks, bridges, level crossings, robs/rubs, yard remodeling, and other engineering works at various locations in ahmedabad division.
Read moreSignaling work in connection with different ctr/ttr works in south section of mumbai division.
Signaling work in connection with different ctr/ttr works in south section of mumbai division.
Read moreBalance outdoor signalling work at kalyan goods yard and kalyan passenger yard in connection with work of unification of goods yard and segregation of long distance and suburban traffic (phase-i) in mumbai division of central railway.
Balance outdoor signalling work at kalyan goods yard and kalyan passenger yard in connection with work of unification of goods yard and segregation of long distance and suburban traffic (phase-i) in mumbai division of central railway.
Read moreRam mandir - electrical (power) work in connection with replacement of indoor signaling installation with electronic interlocking.
Ram mandir - electrical (power) work in connection with replacement of indoor signaling installation with electronic interlocking.
Read moreMarine lines - electrical (power) work in connection with replacement of indoor signaling installation with electronic interlocking.
Marine lines - electrical (power) work in connection with replacement of indoor signaling installation with electronic interlocking.
Read moreProvision of electronic interlocking system including outdoor signalling and telecommunication works in proposed yard arrangements at gadiganuru station in connection with additional loop line work.
Provision of electronic interlocking system including outdoor signalling and telecommunication works in proposed yard arrangements at gadiganuru station in connection with additional loop line work.
Read moreRepair and maintenance of outdoor signaling gears such as signals, location boxes, point machines, track circuit connections, aftc outdoor connections in kalyan section under sse/sig/kyn of mumbai division.
Repair and maintenance of outdoor signaling gears such as signals, location boxes, point machines, track circuit connections, aftc outdoor connections in kalyan section under sse/sig/kyn of mumbai division.
Read moreSw-i:-secunderabad division - bpq-kzj sections: widening/repair of cess ,filling up of low lying areas near toe of bank , providing toe bank, & precast / cast insitu rcc central drain & cross drain hdpe pipe through the railway formation at a required depth to the required slope etc. for a total length of 7.93kms. in sse/p.way/magh&mci section under aden/bpa & aden/rdm sub-division. sw-ii:-bpq - kzj section: cutting the slopes to avoid loose earth filling inside drains and bloc
Sw-i:-secunderabad division - bpq-kzj sections: widening/repair of cess ,filling up of low lying areas near toe of bank , providing toe bank, & precast / cast insitu rcc central drain & cross drain hdpe pipe through the railway formation at a required depth to the required slope etc. for a total length of 7.93kms. in sse/p.way/magh&mci section under aden/bpa & aden/rdm sub-division. sw-ii:-bpq - kzj section: cutting the slopes to avoid loose earth filling inside drains and bloc
Read moreHyderabad division - proposal for signaling arrangements in connection with interlocking of lc no 57,95 & 174 over hyderabad division - electrical trd arrangements
Hyderabad division - proposal for signaling arrangements in connection with interlocking of lc no 57,95 & 174 over hyderabad division - electrical trd arrangements
Read moreof your Industry type