Tender Details
Particulars | Details |
---|---|
Title |
Improvement Of Road By I/L Tiles And Drain From 3/61 Bharadvaj Home To Near Uma Treders In Rajeev Vihar Ward 41 Zone 2
|
Description |
Improvement Of Road By I/L Tiles And Drain From 3/61 Bharadvaj Home To Near Uma Treders In Rajeev Vihar Ward 41 Zone 2
|
Organisation | Kanpur Municipal Corporation, Kanpur, UP | State Govt. and UT |
Tender Id | 2025_NNKAN_1021343_1 |
Reference Number |
611/AA-2/24-25 |
Tender Fee | 1180 |
EMD | 99616 |
Tender Value | |
Place | zone 2 |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1843144 |
Start Date | March 24, 2025 14:30 |
End Date |
29/03/2025 ( Expired 31 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreReconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.
Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.
Read moreImprovement of road from nh 08 to darchawi shermontilla road near pajendra para via sidongbanapally high school under valley adc under pabiacherra assembly constituency l 3575 km of kumarghat pwdr and b division under the scheme for special assistanc
Improvement of road from nh 08 to darchawi shermontilla road near pajendra para via sidongbanapally high school under valley adc under pabiacherra assembly constituency l 3575 km of kumarghat pwdr and b division under the scheme for special assistanc
Read moreConstruction and repairing of cc road, drain, paver blocks, toilets and other diffrent type of civil works from ward no 01 to 08
Construction and repairing of cc road, drain, paver blocks, toilets and other diffrent type of civil works from ward no 01 to 08
Read moreConstruction of oxygen cylinder store shed and cc road with drain from casualty to ct scan building and rcc drain behind isolation ward at apollo hospital biom bacheli complex
Construction of oxygen cylinder store
 shed and cc road with drain from casualty
 to ct scan building and rcc drain behind
 isolation ward at apollo hospital biom
 bacheli complex
Read moreRoad from nh connection (basantipur panchyat) to nh connection (near dharmpur via tv kulam) in the district of north and middle andaman at block mayabunder (iind call)
Road from nh connection (basantipur panchyat) to nh connection (near dharmpur via tv kulam) in the district of north and middle andaman at block mayabunder (iind call)
Read moreUpgradation of rural road from nh connection (near webi junction) to nh connection (near bamboo nalah pahalgaon-1) at mayabunder, north and middle andaman under pmgsy-iii, batch-i, 2024-25 package no. an03mb308, (length 3.100 km).
Upgradation of rural road from nh connection (near webi junction) to nh connection (near bamboo nalah pahalgaon-1) at mayabunder, north and middle andaman under pmgsy-iii, batch-i, 2024-25 package no. an03mb308, (length 3.100 km).
Read moreMaintenance of civil work addition, alteration modification of various building, viaduct and stations from qutub minar to arjangarh metro stations including qutub minar ramp and sultanpur depot in line-2. (for 3 years).
Maintenance of civil work addition, alteration modification of various building, viaduct and stations from qutub minar to arjangarh metro stations including qutub minar ramp and sultanpur depot in line-2. (for 3 years).
Read moreZone no. 03, ward no. 15, construction of rcc drain and culvert from shri om prakash shukla house to nh-7 nala near gupta brothers shop at saman.
Zone no. 03, ward no. 15, construction of rcc drain and culvert from shri om prakash shukla house to nh-7 nala near gupta brothers shop at saman.
Read moreof your Industry type