Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Tharmoplastic Paint Of Iglas Gonda Road (Odr) Km 7, 8, 9, 10, 11, 12, 13, 14 And 15
|
| Description |
Tharmoplastic Paint Of Iglas Gonda Road (Odr) Km 7, 8, 9, 10, 11, 12, 13, 14 And 15
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_CEALG_862665_3 |
|
Reference Number |
3958/3A-2023-24, Date 08-11-2023 |
| Tender Fee | 854 |
| EMD | 1.67 Lakh |
| Tender Value | - |
| Place | Office of The Executive Engineer CD-1 PWD Aligarh |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | November 17, 2023 22:30 |
| End Date |
Expired
23/11/2023
Expired 1058 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of an rcc minor bridge (3 x 18.75m span) at km 2 of the link road taking off from the left side at km 6 of the maharajganj-laliya road (odr) and extending up to amarhawa of balrampur district
Construction of an rcc minor bridge (3 x 18.75m span) at km 2 of the link road taking off from the left side at km 6 of the maharajganj-laliya road (odr) and extending up to amarhawa of balrampur district
Read moreBrown sheet laminated,photocopier paper 210 mm x 297 mm a4,distemper white isi mark,paint brush 9 inch,paint brush 6 inch,paint brush 4 inch,paint roller 4 inch,paint roller 7 inch,paint roller 12 inch,paint roller 9 inch,paint roller 6 inch
Brown sheet laminated,photocopier paper 210 mm x 297 mm a4,distemper white isi mark,paint brush 9 inch,paint brush 6 inch,paint brush 4 inch,paint roller 4 inch,paint roller 7 inch,paint roller 12 inch,paint roller 9 inch,paint roller 6 inch
Read moreWidening and strengthening work on the khaira bazar to kodahi kanera road (odr) from chainage 0.000 to 10.700 (total length 10.700 km) in district bahraich financial year 2026-27 vidhan sabha-mahsi with five year maintenance
Widening and strengthening work on the khaira bazar to kodahi kanera road (odr) from chainage 0.000 to 10.700 (total length 10.700 km) in district bahraich financial year 2026-27 vidhan sabha-mahsi with five year maintenance
Read moreTowing rope 26 dia nylon,rope polypropylene 24 mm isi mark,bag biodegradable small 14 inch x 16 inch,bag biodegradable small 14 inch x 20 inch,petroleum jelly,paint roller refill 9 inch,paint roller refill 6 inch,paint brush 3 inch,paint brush 0.5 inch 13mm,paint brush 1 inch,oil and grease remover
Towing rope 26 dia nylon,rope polypropylene 24 mm isi mark,bag biodegradable small 14 inch x 16 inch,bag biodegradable small 14 inch x 20 inch,petroleum jelly,paint roller refill 9 inch,paint roller refill 6 inch,paint brush 3 inch,paint brush 0.5 inch 13mm,paint brush 1 inch,oil and grease remover
Read moreConstruction of cc road in the service line of block no. 9, 10, 11, 12, 13 and 14 in ward-69, lal quarter.
Construction of cc road in the service line of block no. 9, 10, 11, 12, 13 and 14 in ward-69, lal quarter.
Read moreof your Industry type