Tender Details
Particulars | Details |
---|---|
Title |
Procurement Of Thermo Fischer Scientific Orion Make Reagents And Standards Solution For Swas Analyzers (Such As Silica, Sodium,Chloride) On Oem Basis At 2x600 Mw, Stage I And 2x660 Mw, Stage Ii, Sstpp, Mppgcl, Dongalia
|
Description |
Procurement Of Thermo Fischer Scientific Orion Make Reagents And Standards Solution For Swas Analyzers (Such As Silica, Sodium,Chloride) On Oem Basis At 2x600 Mw, Stage I And 2x660 Mw, Stage Ii, Sstpp, Mppgcl, Dongalia
|
Organisation | Madhya Pradesh Power Generating Company Limited | State Govt. and UT |
Tender Id | 2024_MPPGC_387818_1 |
Reference Number |
PT-3053/Chemical |
Tender Fee | 295 |
EMD | 0 |
Tender Value | |
Place | SSTPP, Dongalia |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=465627 |
Start Date | January 14, 2025 16:30 |
End Date |
04/02/2025 ( Expired 78 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of spares for feed pump, etp sludge transfer pump and fgd make up pump of tmd off site, at 2x660 mw, stage-ii, sstpp ,mppgcl , dongalia.
Procurement of spares for feed pump, etp sludge transfer pump and fgd make up pump of tmd off site, at 2x660 mw, stage-ii, sstpp ,mppgcl , dongalia.
Read moreWork contract for annual maintenance contract of san make locomotives of 2x600 mw, chp-i and 2x660 mw, chp-ii, sstpp, dongalia.
Work contract for annual maintenance contract of san make locomotives of 2x600 mw, chp-i and 2x660 mw, chp-ii, sstpp, dongalia.
Read moreProcurement of spares of tesi make ignitor assembly installed in 2x660 mw, sstpp, mppgcl dongalia/etni-ii
Procurement of spares of tesi make ignitor assembly installed in 2x660 mw, sstpp, mppgcl dongalia
Read moreProcurement of hard facing welding electrode for coal mills installed in boiler of 2x660 mw ph- ii, sstpp, dongalia on limited offer make basis
Procurement of hard facing welding electrode for coal mills installed in boiler of 2x660 mw ph- ii, sstpp, dongalia on limited offer make basis
Read moreWork for assistance in office works at various offices under o/o the addl. c.e. (civil), stage-ii (2x660 mw), sstpp, mppgcl, dongalia distt. khandwa for a period of 12 months.
Work for assistance in office works at various offices under o/o the addl. c.e. (civil), stage-ii (2x660 mw), sstpp, mppgcl, dongalia distt. khandwa for a period of 12 months.
Read moreWork contract for refurbishment of colony potable pump flowmore-make hsc pump model m590 bd 125x100, four stage, by adopting reclamation and replacement technique installed at 2x600 mw, sstpp, mppgcl, dongalia.
Work contract for refurbishment of colony potable pump flowmore-make hsc pump model m590 bd 125x100, four stage, by adopting reclamation and replacement technique installed at 2x600 mw, sstpp, mppgcl, dongalia.
Read more2x660 mw, sstpp phase-ii khandwa- annual general repair and maintenance work of btg/other auxiliary buildings and bop buildings viz. plant water system , foph, switch yard, cw system, chp, ahp and others under stage-ii at sstpp, mppgcl, dongalia
2x660 mw, sstpp phase-ii khandwa- annual general repair and maintenance work of btg/other auxiliary buildings and bop buildings viz. plant water system , foph, switch yard, cw system, chp, ahp and others under stage-ii at sstpp, mppgcl, dongalia
Read moreAnnual contract for general maintenance, operation and pollution control works during operation of ash slurry discharge in ash pond of 2x660 mw stage-ii, sstpp, mppgcl, dongalia distt. khandwa.
Annual contract for general maintenance, operation and pollution control works during operation of ash slurry discharge in ash pond of 2x660 mw stage-ii, sstpp, mppgcl, dongalia distt. khandwa.
Read moreCapital overhauling (coh) work of lmtg make generator of unit 4, 2 x 660 mw stage-ii, sstpp, mppgcl, dongalia
Capital overhauling (coh) work of lmtg make generator of unit 4, 2 x 660 mw stage-ii, sstpp, mppgcl, dongalia
Read moreWork contract for micom make numerical relay testing work installed in grp, strp of unit 2 and 400/220 kv switchyard at 2x600 mw, sstpp, stage-i, mppgcl, dongalia
Work contract for micom make numerical relay testing work installed in grp, strp of unit 2 and 400/220 kv switchyard at 2x600 mw, sstpp, stage-i, mppgcl, dongalia
Read moreof your Industry type