Tender Details

Particulars Details
Title
Design Supply Installation Testing And Commissioning Of Decorative Artistic Lighting For Illumination And Beautification Of Road From Everest Lane To Rasranjan Hotel On M.G. Road Dombivali West Dpdc
Description
Design Supply Installation Testing And Commissioning Of Decorative Artistic Lighting For Illumination And Beautification Of Road From Everest Lane To Rasranjan Hotel On M.G. Road Dombivali West Dpdc
Organisation Government of Maharashtra
Tender Id 2023_KDMC_957358_1
Reference
Number
KDMC/ELECTRICAL/2023-24/14_3
Tender Fee 590
EMD 25000
Tender Value
Place E Tender cell
Link https://mahatenders.gov.in
Start Date October 27, 2023 22:30
End Date

02/11/2023 ( Expired 598 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Read more
Consultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap

Consultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap

Read more
Supply, installation, testing and commissioning of digital subtraction angiography system (single plane cardio vascular catheterization and digital subtraction angiography laboratory high end 3d) 01 no. on turnkey and buy-back basis for the departme

Supply, installation, testing and commissioning of digital subtraction angiography system (single plane cardio vascular catheterization and digital subtraction angiography laboratory high end 3d) 01 no. on turnkey and buy-back basis for the departme

Read more
Package m16 - design, manufacturing, supply, testing and commissioning of catenary maintenance vehicle for delhi ghaziabad-meerut namo bharat corridor.

Package m16 - design, manufacturing, supply, testing and commissioning of catenary maintenance vehicle for delhi ghaziabad-meerut namo bharat corridor.

Read more
Supply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl

Supply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Supply,installation, testing, commissioning and training of electrical, fire alarm and detection, fire fighting, vac and bms works for nine elevated stations

Sholinganallur lake to sipcot 2 station including stabling lines, viaduct between the stations (ch 35044.000 to 44671.000) for corridor- 3 of chennai metro rail project phase-ii.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise