Tender Details
Particulars | Details |
---|---|
Title |
Extension Of Ht Lt Line And 1 X 100 Kva Sub Station For Providing Three Phase Power Supply System At Newly Modified Irp At Khejur Bagan Near Bhagat Sing
|
Description |
Extension Of Ht Lt Line And Construction Of 1 X 100 Kva Sub Station For Providing Three Phase Power Supply System At Newly Modified Irp Including Dtw At Khejur Bagan Near Bhagat Sing Hindhi English Medium School
|
Organisation | Government of Tripura |
Tender Id | 2023_POWER_41558_1 |
Reference Number |
DGM/EDCC/2023-24/15 Dated. 31/08/2023 |
Tender Fee | 472 |
EMD | 7992 |
Tender Value | |
Place | 79 Tilla Agartala Tripura |
Link | https://tripuratenders.gov.in |
Start Date | September 06, 2023 22:30 |
End Date |
15/09/2023 ( Expired 618 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Creation of 100 kva distribution sub station at parade village w. no 3 pyt gorda block mathwar including laying of required 11 kv and lt network for dispersal of power falling under the jurisdiction of electric sub division akhnoor on turnkey basis
Creation of 100 kva distribution sub station at parade village w. no 3 pyt gorda block mathwar including laying of required 11 kv and lt network for dispersal of power falling under the jurisdiction of electric sub division akhnoor on turnkey basis
Read moreSupply, erection, testing, commissioning for 5 x 250 kva sub-stations alongwith lt extension, erection of 5 no isolation point and laying of ht xlpe cable 120 mm sq on 9m st pole at smgs hospital for ac system in ward no 1, 2, 3, 16 , 20 under ed-
Supply, erection, testing, commissioning for 5 x 250 kva sub-stations alongwith lt extension, erection of 5 no isolation point and laying of ht xlpe cable 120 mm sq on 9m st pole at smgs hospital for ac system in ward no 1, 2, 3, 16 , 20 under ed-
Read moreRetender-supply, installation, testing and commissioning of 2v 600 ah lead-acid type stationary cells with tubular positive plates for 100 kwp solar photovoltaic system installed at sub-station-1.
Retender-supply, installation, testing and commissioning of 2v 600 ah lead-acid type stationary cells with tubular positive plates for 100 kwp solar photovoltaic system installed at sub-station-1.
Read moreSupply, erection, testing, commissioning for creation of 250 kva sub-station alongwith laying of ht line and laying of lt line under jjm scheme at wss dhan under the jurisdiction of electric division div-i (jpdcl) jammu on turn key basis
Supply, erection, testing, commissioning for creation of 250 kva sub-station alongwith laying of ht line and laying of lt line under jjm scheme at wss dhan under the jurisdiction of electric division div-i (jpdcl) jammu on turn key basis
Read moreDevelopment of balance portion of pedestrian walk path from kondbal onward , phase ii bwo creation of 25 kva sub station and 30 kva 3 phase avr for providing stablized power supply.
Development of balance portion of &#x0d pedestrian walk path from kondbal &#x0d onward , phase ii bwo creation of 25 &#x0d kva sub station and 30 kva 3 phase &#x0d avr for providing stablized power &#x0d supply.
Read more11 kv cable laying works for new cta sub-station power connection, providing hume pipe and 11 kv cable laying near lions club, digboi and shifting of 11 kv cable from nazirating switch board to township switch board at tinali sub-station for aod.
11 kv cable laying works for new cta sub-station power connection, providing hume pipe and 11 kv cable laying near lions club, digboi and shifting of 11 kv cable from nazirating switch board to township switch board at tinali sub-station for aod.
Read moreWork of con of lt (3 phase 6 wire) overhead line and service connection wire of consumers to underground system at newly erected manohar parrikar junction at parra under sub-division iii , mapusa
Work of con of lt (3 phase 6 wire) overhead line and service connection wire of consumers to underground system at newly erected manohar parrikar junction at parra under sub-division iii , mapusa
Read moreTender for prov. 11 kv hht line along with new 3 ph. lt line and 1 ph. lt line from prop. 11/0.4 kv, 100 kva s.stn. to energize 15 nos. t/well at vill. kuthiari in (e) section amb - 2nd under electrical sub division hpsebl amb.
Tender for prov. 11 kv hht line along with new 3 ph. lt line and 1 ph. lt line from prop. 11/0.4 kv, 100 kva s.stn. to energize 15 nos. t/well at vill. kuthiari in (e) section amb - 2nd under electrical sub division hpsebl amb.
Read moreErection of 3.3kv o/h line from 10 no substation to cocp excavated patch for power supply to pump and installation of 100 kva, 3.3kv/440v lighting transformer along with erection of 440volt o/h line for lighting at cocp pumping station of sarubera
Erection of 3.3kv o/h line from 10 no substation to cocp excavated patch for power supply to pump and installation of 100 kva, 3.3kv/440v lighting transformer along with erection of 440volt o/h line for lighting at cocp pumping station of sarubera
Read moreSupply, installation, testing and commissioning for construction of 11 kv line, construction of lt line and creation sub- stations for providing power supply to army post at dhulung latoo kargil
Supply, installation, testing and commissioning for construction of 11 kv line, construction of lt line and creation sub- stations for providing power supply to army post at dhulung latoo kargil
Read moreof your Industry type