Tender Details
Particulars | Details |
---|---|
Title |
Grass Cutting And Cleaning Of Gss Campus, Gss Colony, Office And Control Room At 132/33 K V Gss, Chandil Ii (Manikui) Under Transmission Sub Division Chandil Ii (Manikui) For The Period From 01.04.2025 To 31.03.2026 (365 Days)
|
Description |
Grass Cutting And Cleaning Of Gss Campus, Gss Colony, Office And Control Room At 132/33 K V Gss, Chandil Ii (Manikui) Under Transmission Sub Division Chandil Ii (Manikui) For The Period From 01.04.2025 To 31.03.2026 (365 Days)
|
Organisation | JSEB | State Govt. and UT |
Tender Id | 2025_JSEB_99478_1 |
Reference Number |
537/PR/JUSNL/2024-25 |
Tender Fee | 5900 |
EMD | 30500 |
Tender Value | |
Place | Chandil-II (Manikui) |
Link | https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=133622 |
Start Date | March 12, 2025 20:30 |
End Date |
02/04/2025 ( Expired 39 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Extension of control room building and renovation of switchyard with allied civil works at boro 33/11 kv sub-station under raghunathpur division, dist.- purulia.
Extension of control room building and renovation of switchyard with allied civil works at boro 33/11 kv sub-station under raghunathpur division, dist.- purulia.
Read moreInstallation of 33 kv indoor gis switchgear panel by extending existing control room at bamunara 132/33kv sub-station under durgapur area office on turn-keybasis
Installation of 33 kv indoor gis switchgear panel by extending existing control room at bamunara 132/33kv sub-station under durgapur area office on turn-keybasis
Read moreBtps-tggenco
Btps - chp - cold and hot vulcanization belt joints, pulley lagging for the conveyors bcn-1a/b, 2a/b and dribble feeders as and when required in mm-i sub division of mm/chp/btps for the period from 01.04.2025 or from the actual date of commencement of work to 31.03.2026.
Read moreBtps-tggenco
Btps - chp - cold and hot vulcanization belt joints, pulley lagging for the conveyors bcn-3a/b and contingency conveyors as and when required in sec-iii of mm-i sub division of mm/chp/btps for the period from 01.04.2025 or from the actual date of commencement of work to 31.03.2026.
Read moreBtps-tggenco
Btps - chp - cold and hot vulcanization belt joints for the 1400mm bw conveyors bcn-8, bcn-9 and stacker cum reclaimer-1,2 conveyors in mm-iv sub division of mm/chp/btps as and when required for the period from 01.04.2025 or actual date of commencement of work to 31.03.2026
Read moreBtps-tggenco
Btps - chp - replacement of new/reconditioned rollers and frames, fabrication and erection of skirt rubber, flap gates and di plates, actuators, guide pipes, er weight structure, oil top up and greasing etc for periodical and breakdown maintenance of belt conveyors as and when required for the conveyor bcn-2a/b of sec-ii of mm-i sub division of mm/chp/btps for the period from 01.04.2025 or from actual date of commencement of work to 31.03.2026.
Read moreBtps-tggenco
Btps - chp - replacement of new/reconditioned rollers and frames, fabricated and erection of skirt rubber, flap gates and di plates etc. for periodical and breakdown maintenance of belt conveyors as and when required for the conveyor bcn - 1a/b of sec - i of mm- i sub division in mm/chp/btps for the period from 01.04.2025 or from the actual date of commencement of work to 31.03.2026
Read morePrive, periodic and breakdown maintenance work of 220/132/33 kv gss, chaibasa-i (ulijhari)
Prive periodic and breakdown maintenance work of 220 132 33 kv gss chaibasa i ulijhari for the period from 01.06.2025 to 31.03.2026
Read moreOutsourcing of manpower for operational work of gss under td chaibasa
Supply of technical and non-technical&#x0d resources for operation of 220 132 33 kv and&#x0d 132 33kv different grid sub-stations under&#x0d transmission division, chaibasa for 10&#x0d months i.e. for the period from 01.06.2025&#x0d to 31.03.2026
Read morePrive, periodic and breakdown maintenance work of 132/33 kv gss, kendposi
Prive, periodic and breakdown maintenance work of 132/33 kv gss, kendposi for the period from 01.06.2025 to 31.03.2026 (i.e. 304 days)
Read moreof your Industry type