Tender Details

Particulars Details
Title
One Time Improvement With White Topping Of Existing Carriageway In Ahmedpur Town On Chakur Latur Section Of Nh 361 In The State Of Maharashtra Through An Engineering, Procurement And Construction (Epc) Contract
Description
One Time Improvement With White Topping Of Existing Carriageway In Ahmedpur Town On Chakur Latur Section Of Nh 361 In The State Of Maharashtra Through An Engineering, Procurement And Construction (Epc) Contract
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2024_NHAI_211308_1
Reference
Number
NHAI/RO-NAG/TENDERS/2024-25/20
Tender Fee 10000
EMD 60.72 Lakh
Tender Value
Place NHAI RO Nagpur
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=231802
Start Date October 15, 2024 00:00
End Date

10/02/2025 ( Expired 71 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.

Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.

Read more
Consultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.

Consultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.

Read more
Construction of service road and slip road between km450.170 to km 471.300 zarap to patradevi section of nh.66 in the state of maharashtra on epc mode

Construction of service road and slip road between km450.170 to km 471.300 zarap to patradevi section of nh.66 in the state of maharashtra on epc mode

Read more
Performance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p

Performance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p

Read more
Construction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra

Construction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra

Read more
Rectification of 08 nos. morth identified blackspots on chittorgarh kota section of nh 27 in the state of rajasthan on engineering, procurement and construction (epc) mode

Rectification of 08 nos. morth identified blackspots on chittorgarh kota section of nh 27 in the state of rajasthan on engineering, procurement and construction (epc) mode

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab

Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab

Read more
One time improvement of bypassed section on potin pangin of nh 13 at km 291.35, km 308.90, km 309.78 and km 310.88 in the state of arunachal pradesh

One time improvement of bypassed section on potin pangin of nh 13 at km 291.35, km 308.90, km 309.78 and km 310.88 in the state of arunachal pradesh

Read more
One time improvement of mahabubabad nellikuduru stretch km 0.0 to 7.0,km 26.1 to 30.2, thorrur nellikuduru stretch km 0.0 to 3.0,thorrur valigonda stretch km 0.0 to 5.6, mahabubabad yellandu stretch km 0.6 to 2.4 of nh 930p in telangana on epc mode

One time improvement of mahabubabad nellikuduru stretch km 0.0 to 7.0,km 26.1 to 30.2, thorrur nellikuduru stretch km 0.0 to 3.0,thorrur valigonda stretch km 0.0 to 5.6, mahabubabad yellandu stretch km 0.6 to 2.4 of nh 930p in telangana on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise