Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Un Interrupted Coal Supply From Km 8/00 To Mayar Bridge (Rihand
|
Description |
Un Interrupted Coal Supply From Km 8/00 To Mayar Bridge (Rihandapproach)
|
Organisation | NTPC Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Rihand Superthermal Power P.O RIHANDNAGAR, DIST. S |
Link |
AAAAAAAAAA Login to view |
Start Date | June 26, 2025 22:30 |
End Date |
03/07/2025 ( 0 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreCs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Cs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Read moreConsultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Read moreConstruction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Read moreConsultancy services for authority engineer for supervision of widening to 2-lane from existing chainage km. 74.700 to km. 100.660 design chainage km 53.365 to km 78.785 on nh-507 in the state of uttarakhand.
Widening to 2-lane from existing chainage km. 74.700 to km. 100.660 design chainage km 53.365 to km 78.785 on nh-507 in the state of uttarakhand.
Read moreConsultancy services for authority engineer for supervision of rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 design chainage from km 71.300 to km 95.947 paligad to jankichatti
Rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode.
Read moreBalance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Read moreDevelop. of 4l badvel to nellore highway from badvel gopavaram vill on nh-67 ch.630.960 to guruvindapudi vill on nh16 ch.739.094 in ap on bot mode for a total length of 108.134 km
Develop. of 4l badvel to nellore highway from badvel gopavaram vill on nh-67 ch.630.960 to guruvindapudi vill on nh16 ch.739.094 in ap on bot mode for a total length of 108.134 km
Read moreof your Industry type