Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Sakav On Msh 4 To Tanashi Vadade Raipada Joining To Mdr 13 Road Odr 25 Ch 4/00 And 6/250 Km Taluka Dahanu District Palghar
|
Description |
Construction Of Sakav On Msh 4 To Tanashi Vadade Raipada Joining To Mdr 13 Road Odr 25 Ch 4/00 And 6/250 Km Taluka Dahanu District Palghar
|
Organisation | RDD-CEO-PALGHAR | State Govt. and UT |
Tender Id | 2025_PALGH_1178030_7 |
Reference Number |
02/EE/WD/UEE/TENDER/2025-26 |
Tender Fee | 2860 |
EMD | 29997 |
Tender Value | |
Place | DAHANU |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2045597 |
Start Date | May 08, 2025 21:00 |
End Date |
15/05/2025 ( Expired 29 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConsultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Consultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Read moreConsultancy services for preparation of dpr and land acquisition of vasmat city bypass road on nh61 connecting to nh61 km 60.00 to km 75.400 in vasmat taluka district hingoli in the state of maharashtra on epc mode. tentative length 17.50 km
Consultancy services for preparation of dpr and land acquisition of vasmat city bypass road on nh61 connecting to nh61 km 60.00 to km 75.400 in vasmat taluka district hingoli in the state of maharashtra on epc mode. tentative length 17.50 km
Read moreImprovement such as widening and strengthening of rayagada-kerada road (mdr-48b) from 0/000 km to 25/166 km in the district of rayagada under state plan
Improvement such as widening and strengthening of rayagada-kerada road (mdr-48b) from 0/000 km to 25/166 km in the district of rayagada under state plan
Read moreConstruction of new buildings for 1) sw post matric girls hostel at palamaner, 2) sw post matric boys hostel at gudiyatham road, palamamer in chittoor district, 3) sw pre matric girl hostel at proddatur, 4) sw pre matric boys hostel at kalasapadu in ysr kadapa district, 5) sw pre matric girls hostel at manubolu in spsr nellore district and 6) sw pre matric boys hostel at tirupati as package -v (6 nos) under pm ajay - esti.rs.1800.00 lakhs
Construction of new buildings for 1) sw post matric girls hostel at palamaner, 2) sw post matric boys hostel at gudiyatham road, palamamer in chittoor district, 3) sw pre matric girl hostel at proddatur, 4) sw pre matric boys hostel at kalasapadu in ysr kadapa district, 5) sw pre matric girls hostel at manubolu in spsr nellore district and 6) sw pre matric boys hostel at tirupati as package -v (6 nos) under pm ajay - esti.rs.1800.00 lakhs
Read moreSopd_g_24_25_40 construction of road cum embankment on left bank of dikrong river (nh 15 at bahanibari to sissapathar bridge approach)( part 2 from ch. 11880.00m to 15140.00m) including approach roads under sopd g for the year 2024-25
Sopd_g_24_25_40 construction of road cum embankment on left bank of dikrong river (nh 15 at bahanibari to sissapathar bridge approach)( part 2 from ch. 11880.00m to 15140.00m) including approach roads under sopd g for the year 2024-25
Read moreStrengthening of chamkar sahib neelon doraha road to morinda-chamkaur sahib road via village kandhola road (odr), length 6.63 km under 5054 rb-10 roads (fy 2025-26) in district rupnagar including 5 years maintenace (1 year dlp and 4 years
Strengthening of chamkar sahib neelon doraha road to morinda-chamkaur sahib road via village kandhola road (odr), length 6.63 km under 5054 rb-10 roads (fy 2025-26) in district rupnagar including 5 years maintenace (1 year dlp and 4 years
Read moreBt renewal works on 1.pakariya road (338/4 to 339/10) 1.10km, 2.yaduveer nagar road 1.30km, 3.amdara road (327/8 to 330/2) 1.80km 4.mahedar road 1.00km of old nh-7, 5.pala approach road 1.48km and 6.parsokha dulni road 1.20km, under sub division maih
Bt renewal works on 1.pakariya road (338/4 to 339/10) 1.10km, 2.yaduveer nagar road 1.30km, 3.amdara road (327/8 to 330/2) 1.80km 4.mahedar road 1.00km of old nh-7, 5.pala approach road 1.48km and 6.parsokha dulni road 1.20km, under sub division maih
Read moreConstruction of 6 lane vup at junction of nh-148b (4-l) and nh-709e (4-l) on bhiwani bypass bhiwani in bhiwani district
Construction of 6 lane vup at junction of nh-148b (4-l) and nh-709e (4-l) on bhiwani bypass bhiwani in bhiwani district
Read moreof your Industry type