Tender Details

Particulars Details
Title
Construction Of Road Baradtanda Salod Ghatana Loni Road Mdr 94 Km 1/00 To 3/500 In Tq. Dist. Yavatmal
Description
Construction Of Road Baradtanda Salod Ghatana Loni Road Mdr 94 Km 1/00 To 3/500 In Tq. Dist. Yavatmal
Organisation Government of Maharashtra
Tender Id 2023_PWR_913745_6
Reference
Number
PWYC/PWD/YTL/01/2023-24
Tender Fee 2360
EMD 1.5 Lakh
Tender Value
Place Superintending Engineer P.W. Circle YAVATMAL
Link
View Original Tender Notice

https://mahatenders.gov.in

Start Date June 09, 2023 15:30
End Date
Expired 23/06/2023

Expired 1124 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Read more
Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575

Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Improvement to baradtanda salod ghatana road mdr -94 km 8/500 to 10/00 ta dsitt. yavatmal

Improvement to baradtanda salod ghatana road mdr -94 km 8/500 to 10/00 ta dsitt. yavatmal

Read more
Improvement to hiwari nakapardi loni road mdr-21 km 10/00 to 13/500 in tq. /dist. yavatmal

Improvement to hiwari nakapardi loni road mdr-21 km 10/00 to 13/500 in tq. /dist. yavatmal

Read more
Improvement to hiwari nakapardi loni road mdr 21 k.m.7/500 to 10/00 in tq yavatmal

Improvement to hiwari nakapardi loni road mdr 21 k.m.7/500 to 10/00 in tq yavatmal

Read more
Improvement of road c. c. drain in village salod on sukali dhanora wadgaon (j) hatgaon salod saikheda rui road mdr-93 km 14/600 to 15/00 km 23/00 to 23/800 in tq. /dist.yavatmal

Improvement of road c. c. drain in village salod on sukali dhanora wadgaon j hatgaon salod saikheda rui road mdr- 93 km 14/600 to 15/00 km 23/00 to 23/800 in tq. /dist. yavatmal

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise