Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply & Installation Of Custom Pre Fabricated/ Portable Cabin
|
| Description |
|
| Organisation | POWER GRID Corporation OF INDIA Limited | Ministry of Power |
| Tender Id | GEM/2024/B/4610428 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | February 20, 2024 17:55 |
| End Date |
Expired
21/03/2024
Expired 937 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Procurement of pre fabricated interim accommodation at ins rajali
Procurement of pre fabricated interim accommodation at ins rajali
Read moreHybrid security fence,cctv camera,alarm system,pre fabricated shelter
Hybrid security fence,cctv camera,alarm system,pre fabricated shelter
Read morePre-fabricated ms containers as per the attached drawing and technical specification
Pre-fabricated ms containers as per the attached drawing and technical specification
Read moreProvn of pre-fabricated porta cabins for detachments in different location at af stn phalodi
Provn of pre-fabricated porta cabins for detachments in different location at af stn phalodi
Read moreConstruction of prefabricated/pre-engineered pota cabin in jail on epc (engineering procurement and construction basis at mandal kara, saharsa, supaul & madhepura (total no of cabin = 03 nos)
Construction of prefabricated/pre-engineered pota cabin in jail on epc (engineering procurement and construction basis at mandal kara, saharsa, supaul & madhepura (total no of cabin = 03 nos)
Read moreConstruction of pre-fabricated shed for relocation of the existing boiler (central heating system) installed at vip hut (bobby hut) at pahalgam
Construction of pre-fabricated shed for relocation of the existing boiler (central heating system) installed at vip hut (bobby hut) at pahalgam
Read moreFabricated entrance gate,fabricated masonry wall,fabricated base,prayer wheels,prayer flag mast pole,corner pillars,solar led lights with pole,transportation and installation charges
Fabricated entrance gate,fabricated masonry wall,fabricated base,prayer wheels,prayer flag mast pole,corner pillars,solar led lights with pole,transportation and installation charges
Read more120/27 panchayath office new cabin electrification cabin electrification
120/27 panchayath office new cabin electrification
Read moreConstruction of prefabricated/ pre-engineered pota cabin in jail on epc (engineering procurement and construction) basis at muzaffarpur central jail, hajipur divisional jail and sitamarhi, divisional jail. (total no of cabin = 03 nos)
Construction of prefabricated/ pre-engineered pota cabin in jail on epc (engineering procurement and construction) basis at muzaffarpur central jail, hajipur divisional jail and sitamarhi, divisional jail. (total no of cabin = 03 nos)
Read moreof your Industry type