Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Protective Roofing At Pit Bottom Of No 1 And 2 Pit At Vk Unit And No 1 And 3 Pit At Nkj Unit Of Khandra Colliery
|
Description |
Construction Of Protective Roof At No 2 And 3 Pit At E.S.P Unit Of Shyamsundarpur Colliery (Retender).
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 7300 |
Tender Value | |
Place | Shyamsundarpur Colliery |
Link |
AAAAAAAAAA Login to view |
Start Date | July 07, 2025 14:30 |
End Date |
17/07/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreDye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreIntegrated development of outer container terminal and berth no. 1 though 5 nsd at kds, smpk on dbfot basis through ppp mode.
Integrated development of outer container terminal and berth no. 1 though 5 nsd at kds, smpk on dbfot basis through ppp mode
Read moreConstruction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreConsultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63
Consultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63
Read moreConstruction of 220/132 kv, 160 mva and 132/33 kv, 1x31.5 mva gss at bambloo (district-bikaner) along with 01 no. of 33 kv, 5.43 mvar capacitor bank at 220 kv gss, bambloo and 2x220 kv bays at 220 kv gss seruna work on turnkey basis bn9019002518
Construction of 220/132 kv, 160 mva and 132/33 kv, 1x31.5 mva gss at bambloo (district-bikaner) along with 01 no. of 33 kv, 5.43 mvar capacitor bank at 220 kv gss, bambloo and 2x220 kv bays at 220 kv gss seruna work on turnkey basis bn9019002518
Read moreOperation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Operation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Read moreConstruction of 16 nos living accommodation other than married for jcos/supvrs at hq ce p swastik under job no. 30/279 and construction of 29 nos living accommodation other than married for or at hq ce p swastik under job no. 30/280 on gangtok
Construction of 16 nos living accommodation other than married for jcos/supvrs at hq ce p swastik under job no. 30/279 and construction of 29 nos living accommodation other than married for or at hq ce p swastik under job no. 30/280 on gangtok
Read moreWork of construction of 01 no. proposed 33 kv sone solar energy four pvt. ltd. bay and other related misllaneous works at 220/132 kv substation kabrai under etd hamirpur.
Work of construction of 01 no. proposed 33 kv sone solar energy four pvt. ltd. bay and other related misllaneous works at 220/132 kv substation kabrai under etd hamirpur.
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreof your Industry type