Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Tightening Of Loose Wires, Replacement Of Jumpers, Lead Repair, Tpmo/Fuse Repair, Replacement Of Damaged Lugs, Studs In Various 33 Kv, 11 Kv And Lt Lines And 11/0.4 Kv Substations Under The Electricity Distribution Division Modinagar. Replaceme
|
| Description |
Tightening Of Loose Wires, Replacement Of Jumpers, Lead Repair, Tpmo/Fuse Repair, Replacement Of Damaged Lugs, Studs In Various 33 Kv, 11 Kv And Lt Lines And 11/0.4 Kv Substations Under The Electricity Distribution Division Modinagar. Replaceme
|
| Organisation | Paschimanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT |
| Tender Id | 2024_PVVNL_969557_1 |
|
Reference Number |
T-38/2024-25/EDC/GZB |
| Tender Fee | 1180 |
| EMD | 5000 |
| Tender Value | - |
| Place | Superintending Engineer EDC GZB |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1695310 |
| Start Date | October 28, 2024 23:30 |
| End Date |
Expired
09/11/2024
Expired 707 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tightening of loose wires, replacement of jumpers, lead repair, tpmo/fuse repair, replacement of damaged lugs, studs in various 33 kv, 11 kv and lt lines and 11/0.4 kv substations under the electricity distribution division - muradnagar. replacem
Tightening of loose wires, replacement of jumpers, lead repair, tpmo/fuse repair, replacement of damaged lugs, studs in various 33 kv, 11 kv and lt lines and 11/0.4 kv substations under the electricity distribution division - muradnagar. replacem
Read morePipe and chemical earthing replacement of damaged fuse wires lugs cables for protection of 11 04 kv distribution transformers eminating from various 33 11 kv substations
Pipe and chemical earthing replacement of damaged fuse wires lugs cables for protection of 11 04 kv distribution transformers eminating from various 33 11 kv substations
Read moreWorks of 33 kv tpmo etc. replacement business plan 2024-25 under edd-i amroha.
Works of 33 kv tpmo etc. replacement business plan 2024-25 under edd-i amroha.
Read moreUnder electricity distribution division, modinagar, construction work of line and replacement of damaged pole due to theft of wires of 33 kv line going from 220 kv sub-station faridnagar to 33/11 kv sub-station gadana (rural).
Under electricity distribution division, modinagar, construction work of line and replacement of damaged pole due to theft of wires of 33 kv line going from 220 kv sub-station faridnagar to 33/11 kv sub-station gadana (rural).
Read moreWork for replacement of conductor,installation of tpmo set and construction of 11 kv feeder in edd 1 fatehpur
Work for replacement of conductor,installation of tpmo set and construction of 11 kv feeder in edd 1 fatehpur
Read moreFor the work of carrying out of miscellaneous works such as replacement of 11 kv vacuum interrupter, 33/11 kv jointing kit aluminum lugs, studs, lt pvc leads etc. at business plan 2024-25 scheme under eudd-iii, meerut.
For the work of carrying out of miscellaneous works such as replacement of 11 kv vacuum interrupter, 33/11 kv jointing kit aluminum lugs, studs, lt pvc leads etc. at business plan 2024-25 scheme under eudd-iii, meerut.
Read moreFor the work of carrying out of miscellaneous works such as replacement of 11 kv vacuum interrupter, 33/11 kv jointing kit aluminum lugs, studs, lt pvc leads etc. in business plan 2024-25 scheme under eudd-v, meerut.
For the work of carrying out of miscellaneous works such as replacement of 11 kv vacuum interrupter, 33/11 kv jointing kit aluminum lugs, studs, lt pvc leads etc. in business plan 2024-25 scheme under eudd-v, meerut.&#x0d &#x0d
Read moreFor the works of maintenance of 33 kv tpmo and 11 kv vcb, replacement of damaged packing of power transformer at partapur, aman vihar, udyogpuram under eudd-33 kv line, meerut.
For the works of maintenance of 33 kv tpmo and 11 kv vcb, replacement of damaged packing of power transformer at partapur, aman vihar, udyogpuram under eudd-33 kv line, meerut.
Read moreOffloading the work for repairing of railpath cracks replacement and tightening of barrel bolts and joint studs and replacement of railsegment and live ring assy in 24 96 vindhya dragline of dudhichua project
Offloading the work for repairing of railpath cracks replacement and tightening of barrel bolts and joint studs and replacement of railsegment and live ring assy in 24 96 vindhya dragline of dudhichua project
Read moreImprovement /stabilisation of 33 kv line from gopalpora grid to recieving station pahalgam including branch cutting , restringing of loose conductor , tightening of jumpers, straightening of tilted poles, construction of emankment at shilipora
Improvement /stabilisation of 33 kv line from gopalpora grid to recieving station pahalgam including branch cutting , restringing of loose conductor , tightening of jumpers, straightening of tilted poles, construction of emankment at shilipora
Read moreof your Industry type