Tender Details
Particulars | Details |
---|---|
Title |
Improvement /Stabilisation Of 33 K V Line From Gopalpora Grid To Recieving Station Pahalgam Including Branch Cutting , Restringing Of Loose Conductor , Tightening Of Jumpers, Straightening Of Tilted Poles, Construction Of Emankment At Shilipora
|
Description |
Improvement /Stabilisation Of 33 K V Line From Gopalpora Grid To Recieving Station Pahalgam Including Branch Cutting , Restringing Of Loose Conductor , Tightening Of Jumpers, Straightening Of Tilted Poles, Construction Of Emankment At Shilipora
|
Organisation | DC-PDD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1000 |
EMD | 39712 |
Tender Value | |
Place | Mattan to Pahalgam |
Link |
AAAAAAAAAA Login to view |
Start Date | April 05, 2025 22:30 |
End Date |
21/04/2025 ( 0 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Read moreConstruction of power cable trench, drain and other civil works for evacuation of power from food park 220/132/33 kv sub-station to food park 33/11 kv sub-station under uluberia division in the dist.- howrah
Construction of power cable trench, drain and other civil works for evacuation of power from food park 220/132/33 kv sub-station to food park 33/11 kv sub-station under uluberia division in the dist.- howrah
Read moreConstruction work of new 33 kv line from substation dudhtalai to saint paul s/s division ujjain city west circle ujjain for simhastha-2028
Construction work of new 33 kv line from substation dudhtalai to saint paul s/s division ujjain city west circle ujjain for simhastha-2028
Read moreStringing of two nos of 33 kv overhead transmission line for providing power supply from bina main switching station to substation a of madhucon construction at bina project
Stringing of two nos. of 33kv overhead transmission line for providing power supply from bina main switching substation to substation of m/s madhucon construction at bina project (ncl)
Read moreConstruction of plinth and repairing existing 33 kv line acsr panther conductor bindal to mdda clock tower s/s at river bindal repairing work from 132 kv s/s bindal to bindal bridge.
Construction of plinth and repairing existing 33 kv line acsr panther conductor bindal to mdda clock tower s/s at river bindal repairing work from 132 kv s/s bindal to bindal bridge.
Read moreAnnual housekeeping work of 220/132/33 kv grid sub station, giridih for the period from 01.05.2025 to 31.03.2026 of f.y. 2025-26
Annual housekeeping work of 220/132/33 kv grid sub station, giridih for the period from 01.05.2025 to 31.03.2026 of f.y. 2025-26
Read moreAnnual housekeeping work of 132/33 kv grid sub station, madhupur for the period from 01.05.2025 to 31.03.2026 of f.y. 2025-26
Annual housekeeping work of 132/33 kv grid sub station, madhupur for the period from 01.05.2025 to 31.03.2026 of f.y. 2025-26
Read moreAnnual housekeeping work of 132/33 kv grid sub station, deoghar for the period from 01.05.2025 to 31.03.2026 of f.y. 2025-26
Annual housekeeping work of 132/33 kv grid sub station, deoghar for the period from 01.05.2025 to 31.03.2026 of f.y. 2025-26
Read moreAnnual housekeeping work of 132/33 kv grid sub station, jamtara for the period from 01.05.2025 to 31.03.2026 of f.y. 2025-26
Annual housekeeping work of 132/33 kv grid sub station, jamtara for the period from 01.05.2025 to 31.03.2026 of f.y. 2025-26
Read moreAnnual housekeeping work of 220/132/33 kv grid sub station, jasidih for the period from 01.05.2025 to 31.03.2026 of f.y. 2025-26
Annual housekeeping work of 220/132/33 kv grid sub station, jasidih for the period from 01.05.2025 to 31.03.2026 of f.y. 2025-26
Read moreof your Industry type