Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Part A. Deepscreening Of 27.997 Tkm Track And 10 T/Os By Bcm In The Jurisdiction Of Den(e)bb. (Umbrella Work).
Pwp No.31045,31046,31054, 31055)
Part B Trr(p) 19.683 Km(15.40 Km In Bsr Jnpt And 4.283 Km In Pnvl Roha) In Den (E)bb Section (Pwp No.31046,31045) (Umbrella Work).
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 77506769 |
|
Reference Number |
CR-DRMWBB-2024-24-04 |
| Tender Fee | 0 |
| EMD | 3.12 Lakh |
| Tender Value | - |
| Place | Mumbai CST |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/102024/77506769/viewNitPdf_4721104.pdf |
| Start Date | September 20, 2024 15:50 |
| End Date |
Expired
25/10/2024
Expired 674 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Maintenance of suranahalli cross to narayanapura road via suranahalli, vaderahalli, bomberahalli and yalagatta km 0.00 to 13.17 and km 13.89 to 15.40 in challakere taluk
Maintenance of suranahalli cross to narayanapura road via suranahalli, vaderahalli, bomberahalli and yalagatta km 0.00 to 13.17 and km 13.89 to 15.40 in challakere taluk
Read moreMaintenance of road from malgathi cross (on sh149) connecting bolewad (on sh240) via malgathi, bhopal tegnur, venkatbennur, nippani, itga(a), kalbennur mdr04089 14.36 km to 15.40 km in kalagi taluka of kalaburagi dist.under 3054 mdr maintenance for the year 2026-27.
Maintenance of road from malgathi cross (on sh149) connecting bolewad (on sh240) via malgathi, bhopal tegnur, venkatbennur, nippani, itga(a), kalbennur mdr04089 14.36 km to 15.40 km in kalagi taluka of kalaburagi dist.under 3054 mdr maintenance for the year 2026-27.
Read moreAnnual maintenance of bb-bt road to join bn road to holalu road. via yelechkanahalli, yeliuru village from ch.0.00 to 13.50 km at selected reaches for the year 2026-27 in mandya taluk.
Annual maintenance of bb-bt road to join bn road to holalu road. via yelechkanahalli, yeliuru village from ch.0.00 to 13.50 km at selected reaches for the year 2026-27 in mandya taluk.
Read moreA)prism gedo trolly survey for correction of alignment of track under sr.den(hb)section. b)prism gedo trolly survey for correction of alignment of track between dw-pnvl, pnvl-roha, dw-bsr section in jurisdiction of den(e) bb.
For complete deion and other details, please refer to tender
Read moreDetailed estimate for systematic overhauling of 137.50 km track by manual screening of ballast in crib, shoulder etc. under traffic and lowering/widening of cess in the jurisdiction of den (east) bb section [jsle-jnpt = 30.00 km, dw-bsr = 30.00 km, pnvl-hmrr = 27.50 km & hmrr-roha = 50.00 km]
For complete deion and other details, please refer to tender
Read moreFabrication of in-situ glued joint in den(e)bb section 2023-01-04
For complete deion and other details, please refer to tender
Read moreHowrah division - ctr(p) - 2.688tkm ctr(p) bdc kwae dn bb loop 123.103 km to 124 km. =0.897 km & bdc kwae dn bb loop 124 km to 125 km. = 1 km ctr(p) bdc kwae up bb loop 105.980 to 106.450 km & dn bb loop 122.692 km to 123.013 km. total -1.897 0.791=2.688 km & other ancillary works in the section of den/3/hwh
For complete deion and other details, please refer to tender
Read moreHowrah division - tbr work under den/iii/hwh - 6.920 km bdc - kwae dn bb loop 3.870 - 4.060 = 0.190 km, 4.945 - 4.957 = 0.012 km, 7.902 - 8.105 = 0.203 km, 8.202 - 8.396 = 0.194 km, 8.720 - 8.849 = 0.129 km, 8.870 - 9.030 = 0.160 km, 16.210 - 16.292 = 0.082 km. bdc - kwae dn bb loop- 65.000 - 65.900 = 0.900 km,75.805 - 76.090 = 0.285 km, 78.785 - 79.200 = 0.415 km. bdc kwae dn bb loop 5.858 - 6.858 = 1.000 km. bdc kwae up bb loop 70.500 - 71.000 = 0.500 km, 50.400 - 50.850 = 0.450 km. dn bb lo
For complete deion and other details, please refer to tender
Read moreCsmt-pnvl the work of twr - 8.340 tkm with 60kg rails by using mobile flash butt welding plant in sr. den hb section.
For complete deion and other details, please refer to tender
Read moreA)ctr (s) 18.334 tkm [dw-bsr dn loop: 0.834 km, jnpt holding yard: 10.500 km, jsle yard: 7.000 km] by contractor s pqrs portal in den (e) bb section.(irpsm id:- 01.02.31.25.3.10.020) b)tsr (p) 13.40tkm with contractor s pqrs portal and trr(s) 13.40 tkkalamboli yard. [irpsm id: 01.02.31.24.3.10.020] c)ctr(p) 7.06 tkm with trt & 2 tkm with pqrs) in den(e) bb section (work to be carried out by contractor s pqrs portal) pwp no. 2024-25:31045,31046)irpsm id:01.02.31.24.3.00.
For complete deion and other details, please refer to tender
Read moreof your Industry type