Tender Details
Particulars | Details |
---|---|
Title |
Ttps Mech Ii Bm Unit I Ii Iii Attending Breakdown Works In Hp Valves Actuators Safety Valves Wb Lrsb Prds Etc In Unit I Ii Iii Boiler For The Period From 01 04 2025 To 31 03 2026
|
Description |
Ttps Mech Ii Bm Unit I Ii Iii Attending Breakdown Works In Hp Valves Actuators Safety Valves Wb Lrsb Prds Etc In Unit I Ii Iii Boiler For The Period From 01 04 2025 To 31 03 2026
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_525238_1 |
Reference Number |
CE/TTPS/SE/M-II/No.17/2025-26 |
Tender Fee | 0 |
EMD | 24400 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=625272 |
Start Date | February 15, 2025 23:30 |
End Date |
03/03/2025 ( Expired 95 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Carrying routine patrolling prive breakdown maintenance of 132kv d c pakur rajmahal transmission line from loc no 01 to 267 64km under jurisdiction of transmission sub division rajmahal for the period from 01 07 2025 to 31 03 2026 i e
Carrying routine patrolling prive breakdown maintenance of 132kv d c pakur rajmahal transmission line from loc no 01 to 267 64km under jurisdiction of transmission sub division rajmahal for the period from 01 07 2025 to 31 03 2026 i e
Read moreTtps mech ii bm unit iii strengthening of weak welding joints of step grills platform grills and renewal of damaged corroded structurals from 0 mtr to 52 mtr elevation of unit iii boiler
Ttps mech ii bm unit iii strengthening of weak welding joints of step grills platform grills and renewal of damaged corroded structurals from 0 mtr to 52 mtr elevation of unit iii boiler
Read moreTtps mech ii bm unit iii replacement of wornout corroded structural supports painting of structurals removal of existing wornout asbestos sheets and providing new galvalume sheets in all four sides in unit iii boiler at 56mtr elevation
Ttps mech ii bm unit iii replacement of wornout corroded structural supports painting of structurals removal of existing wornout asbestos sheets and providing new galvalume sheets in all four sides in unit iii boiler at 56mtr elevation
Read moreMtps i bm unit i boiler pressure parts aoh 2025 rectification of buck stay beam and supports renewal of wornout buck stay pin fabrication of buck stay cover plate etc in ist and ii nd pass area and allied works
Mtps i bm unit i boiler pressure parts aoh 2025 rectification of buck stay beam and supports renewal of wornout buck stay pin fabrication of buck stay cover plate etc in ist and ii nd pass area and allied works
Read moreGeneral annual maintenance contract of 8tr ductable ac unit in new casuality ground floor from 01/04/2025 to 31/03/2026-mch, kottayam electrical ac work
General-annual maintenance contract of 8tr ductable ac unit in new casuality ground floor from 01/04/2025 to 31/03/2026-mch, kottayam-electrical ac work
Read moreNctps i se m ii ahp dn unit iii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit iii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreNctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreNctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreEmandmrt- annual maintenance contract of 1768kgs ncl (numeric control logic) controller unit-ix boiler lift at ktps-v stage for the period from 01-07-2025 to 31-03-2026.
Emandmrt- annual maintenance contract of 1768kgs ncl (numeric control logic) controller unit-ix boiler lift at ktps-v stage for the period from 01-07-2025 to 31-03-2026.
Read moreKtps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Read moreof your Industry type