Tender Details
Particulars | Details |
---|---|
Title |
Ttps Mech Ii Bm Unit Iv V Attending Breakdown Works In Hp Valves Actuators Safety Valves Wb Lrsb Prds Etc And Cleaning Of I Ii Pass Boiler Structures From 0 Metre To 56 Metre Elevation In Unit Iv V Boiler For The Period From 01 04 2025 To 31 03 2026
|
Description |
Ttps Mech Ii Bm Unit Iv V Attending Breakdown Works In Hp Valves Actuators Safety Valves Wb Lrsb Prds Etc And Cleaning Of I Ii Pass Boiler Structures From 0 Metre To 56 Metre Elevation In Unit Iv V Boiler For The Period From 01 04 2025 To 31 03 2026
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_525253_1 |
Reference Number |
CE/TTPS/SE/M-II/No.18/2025-26 |
Tender Fee | 0 |
EMD | 30800 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=625302 |
Start Date | February 15, 2025 23:30 |
End Date |
03/03/2025 ( Expired 95 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps mech ii bm unit iii strengthening of weak welding joints of step grills platform grills and renewal of damaged corroded structurals from 0 mtr to 52 mtr elevation of unit iii boiler
Ttps mech ii bm unit iii strengthening of weak welding joints of step grills platform grills and renewal of damaged corroded structurals from 0 mtr to 52 mtr elevation of unit iii boiler
Read moreTtps mech ii bm unit iii replacement of wornout corroded structural supports painting of structurals removal of existing wornout asbestos sheets and providing new galvalume sheets in all four sides in unit iii boiler at 56mtr elevation
Ttps mech ii bm unit iii replacement of wornout corroded structural supports painting of structurals removal of existing wornout asbestos sheets and providing new galvalume sheets in all four sides in unit iii boiler at 56mtr elevation
Read moreTtps mech ii bm unit iv v overhauling of igv assembly for unit iv v fd fans model an18e6
Ttps mech ii bm unit iv v overhauling of igv assembly for unit iv v fd fans model an18e6
Read moreTtps mechii bm unt v reconditioning of coal nozzle and matching with coal nozzle tips released from unit v boiler during 2025 2026 overhaul
Ttps mechii bm unt v reconditioning of coal nozzle and matching with coal nozzle tips released from unit v boiler during 2025 2026 overhaul
Read moreTtps mechii bm full reconditioning of worn out coal nozzle tips released from unit v boiler during 2025 2026 overhaul
Ttps mechii bm full reconditioning of worn out coal nozzle tips released from unit v boiler during 2025 2026 overhaul
Read moreTtps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026
Ttps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii bm unit iv v boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of burn
Ttps mech ii bm unit iv v boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of burn
Read moreTtps mech ii bm unit i ii iii boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of
Ttps mech ii bm unit i ii iii boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of
Read moreTtps mech ii ahp breakdown maintenance works in ash slurry disposal lines of unit iv v for the period from 01 04 2025 to 3103 2026
Ttps mech ii ahp breakdown maintenance works in ash slurry disposal lines of unit iv v for the period from 01 04 2025 to 3103 2026
Read moreTtps mech ii ahp breakdown maintenance works in ash slurry disposal lines of unit iii for the period from 01 04 2025 to 3103 2026
Ttps mech ii ahp breakdown maintenance works in ash slurry disposal lines of unit iii for the period from 01 04 2025 to 3103 2026
Read moreof your Industry type