Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Deployment Of Experienced Specialized Supervisor For Ducting, Insulation Area In Boiler Package For Two Months At 1x660 Mw U 5 Sagardighi Thermal Power Project, Phase Iii, Unit 5.
|
| Description |
Deployment Of Experienced Specialized Supervisor For Ducting, Insulation Area In Boiler Package For Two Months At 1x660 Mw U 5 Sagardighi Thermal Power Project, Phase Iii, Unit 5.
|
| Organisation | Bharat Heavy Electricals Limited | Central Govt. Ministry/Department |
| Tender Id | 2025_BHEL_807086_1 |
|
Reference Number |
BHEL- PSER- SGD- 2025- Boiler-83A |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | 1x660 MW Sagardighi Thermal Power Project, Unit-5 |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1111825 |
| Start Date | July 29, 2025 20:20 |
| End Date |
Expired
30/07/2025
Expired 445 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
757/p-3/emp-13345 dt. 25.09.2026 for overhauling of boiler auxiliaries like id fans, fd fans and their auxiliaries, ducting, dampers and gates for 01 unit of 210 mw bhel make units of 4x210 mw capacity at ggsstp, ropar
Overhauling of boiler auxiliaries like id fans, fd fans and their auxiliaries, ducting, dampers and gates for 01 unit of 210 mw bhel make units of 4x210 mw capacity at ggsstp, ropar
Read moreBmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Read moreProcurement of insulation for boiler at 1x660 mw u#5 sagardighi thermal power project
Procurement of insulation for boiler at 1x660 mw u#5 sagardighi thermal power project
Read moreProcurement of insulation for boiler at 1x660 mw u-5 sagardighi thermal power project
Procurement of insulation for boiler at 1x660 mw u-5 sagardighi thermal power project
Read moreOn-line leak sealing services during unit operation in boiler and turbine areas at 1x660 mw bhel sagardighi site.flow control valve) at 1x660 mw bhel sagardighi site.
On-line leak sealing services during unit operation in boiler and turbine areas at 1x660 mw bhel sagardighi site.flow control valve) at 1x660 mw bhel sagardighi site.
Read moreCable tray support lot2 1x660 mw sagardighi tpp
Cable tray support lot2 1x660 mw sagardighi tpp
Read moreBattery discharge resistor of 1x660 mw sagardighi tpp
Battery discharge resistor of 1x660 mw sagardighi tpp
Read moreLt control cables lot2 supply 1x660 mw sagardighi tpp
Lt control cables lot2 supply 1x660 mw sagardighi tpp
Read moreof your Industry type