Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Re Tender Umra,Construction Of Dirty Water Drain H/O Dharmveer To Ghadova Pond(ps)
|
| Description |
Re Tender Umra,Construction Of Dirty Water Drain H/O Dharmveer To Ghadova Pond(ps)
|
| Organisation | Government of Haryana |
| Tender Id | 2024_HRY_342044_1 |
|
Reference Number |
202452DE5E62 ABBB 42BE 8A6D F18EC9E15C7E2023DEV |
| Tender Fee | 500 |
| EMD | 6706 |
| Tender Value | - |
| Place | SDO PR HANSI-1 |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in |
| Start Date | January 09, 2024 14:30 |
| End Date |
Expired
18/01/2024
Expired 1001 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Re-excavation of gouribari pond
Re-excavation of gouribari pond at j.l. no. 36, dag no. 89 at chaitali mouza, bankura district
Read moreRe-tender-annual plan-chpm 2025 -26 myladumpara drinking water project pond protection work
Re-tender-annual plan-chpm 2025 -26 myladumpara drinking water project pond protection work
Read moreRe tender mla-sdf-2025-26 mammood dwss project -construction of pond and installation of pump, pipes, tank in nedumkandam gp
Mla-sdf-2025-26 mammood dwss
Read moreTransmission line package tl01 associated with transmission system strengthening at karur ps for integration of re generation capacity through tariff based competitive bidding (tbcb) route
Transmission line package tl01 associated with transmission system strengthening at karur ps for integration of re generation capacity through tariff based competitive bidding (tbcb) route
Read moreStatcom package st24t for 400 mvar statcom at mandsaur ps (excluding civil works) associated with part-a under common transmission system augmentation for evacuation of power from 2x800 mw gadarwara-ii tps and an additional 1500 mw re power at mandsaur ps (part-a & part-b) through tbcb route
Statcom package st24t for 400 mvar statcom at mandsaur ps (excluding civil works) associated with part-a under common transmission system augmentation for evacuation of power from 2x800 mw gadarwara-ii tps and an additional 1500 mw re power at mandsaur ps (part-a & part-b) through tbcb route
Read moreSurfacing work (wmm, dbm, bc, tc, pc, rm) as per boq/ps btwn km 62.00 to km 67.00 re-alignment stretches take off pt km 62.00 (km 0.00) and meeting pt km 67.00 (km 5.00) and btwn km 54.00 to km 55.00 on galhar-sansari road in 118 rcc/project spk
Surfacing work (wmm, dbm, bc, tc, pc, rm) as per boq/ps btwn km 62.00 to km 67.00 re-alignment stretches take off pt km 62.00 (km 0.00) and meeting pt km 67.00 (km 5.00) and btwn km 54.00 to km 55.00 on galhar-sansari road in 118 rcc/project spk
Read moreRe tender umra,construction of dirty water drain h/o dharmveer to ghadova pond(ps)
Re tender umra,construction of dirty water drain h/o dharmveer to ghadova pond(ps)
Read moreUmra,construction of dirty water drain h/o dharmveer to ghadova pond(ps)
Umra,construction of dirty water drain h/o dharmveer to ghadova pond(ps)
Read moreRe tender umra,rising of r/wall ghadova pond(ps)
Re tender umra,rising of r/wall ghadova pond(ps)
Read moreRe tender umra,rising of r/wall ghadova pond(ps)
Re tender umra,rising of r/wall ghadova pond(ps)
Read moreof your Industry type